Site plan requirements explain what information a drawing must show for a particular property and application. For site plan review, confirm the local regulations and approval process that apply to the proposal. Start with the site’s survey, existing conditions and proposed work. Then confirm the municipality’s current drawing checklist before preparing the submission.
The nine topics below are common drawing items, not a universal Ontario approval rule. For example, Toronto’s application terms of reference explain that requirements and detail vary by proposal. Identify the survey or base drawing and its date. Show existing and proposed conditions clearly, and coordinate related drawings.
A site drawing is not the same as site plan control approval. For broader application coordination, see Elmid Design Inc.’s site plan approval service. This article stays focused on drawing content.