ELMID DESIGN INC. | ENGINEERING INSIGHTS

Toronto Permit Status: Official Lookup and Review Guidance

Building Permit Innisfil

Check Toronto permit status using the City’s official Building Application Status search. Search with the property address or a partial or complete application/permit number. Select the matching record and review its application and inspection information. See our building permit services for how we can help with your project.

The City says the information reflects the previous business day, so it is not a live tracker. Its status guidance and glossary explain the record limits and each status. The search generally covers active permits up to ten years from application and permits closed or cancelled within the previous month.

In the City’s glossary, “Under Review” means review is underway; “Notice Sent” indicates outstanding items awaiting a response. “Issuance Pending” means other approvals or fees remain, while “Permit Issued” confirms issuance. Read the actual notice before deciding what to submit.

If you cannot find the record or need clarification, use the City’s contact route and the application correspondence. Elmid Design Inc. can help address engineering drawing comments within an agreed service scope. Checking a status or hiring a consultant does not guarantee approval or a review date.


How do I check my Toronto building permit status?

Open the City of Toronto’s Building Application Status search, enter the property address or a partial or complete application/permit number, and select the matching record. The record shows the current application status and, after issuance, inspection information. Compare the status with the official glossary before acting on it.

  1. Go to the City’s Building Permit Application & Inspection Status page and select Search Permit Status.
  2. Search by address (or by clicking the map), or enter the application number. The plan review page says the application number is included in the email you receive at application intake.
  3. Choose the record type if needed. The search form lists Building Permit, Sign Variance, Zoning Review, Issued Orders and Rental Renovation Licence.
  4. Open the matching record, note the status, and look it up in the status glossary.
  5. If the status refers to a notice, read the notice itself. The status line only tells you that a notice exists, not what it asks for.
Elmid Design Inc. team member handing Toronto building permit documents to a client

What do the common Toronto permit statuses mean?

Each status describes the stage an application has reached, such as intake, review, a notice waiting for a response, or issuance. Toronto Building publishes a glossary for every status. The table below paraphrases the statuses applicants see most often; use the official wording if anything differs.

Status shownWhat the glossary says it means
Application ReceivedThe application has been received, but intake has not been accepted or processed.
Not StartedThe application has been accepted, but the review has not started.
Under ReviewThe application has been accepted and the review has started but is not complete.
On HoldThe application has been received but is on hold because information is missing.
Notice SentThe examiner found deficiencies or outstanding items, sent a notice, and is waiting for a response.
Response ReceivedA response to a notice has been submitted to Toronto Building.
Response AcceptedA response has been submitted and the application is back in the review queue.
Issuance PendingThe review is complete, but other approvals and/or fees are outstanding.
Ready for IssuanceThe review is complete and the permit can be issued. Related mechanical or plumbing permits may have to be issued together.
Permit IssuedThe permit has been issued.
InspectionThe permit has been issued and is under active inspection.
Cancellation PendingThe application has been dormant for over five months and a cancellation notice has been sent by registered mail.
Paraphrased from the City of Toronto Building Permit Status Glossary (accessed November 10, 2026). Check the glossary for the full list.

How current is the status information?

Toronto Building says the status site is updated as of the previous business day, so a change made today may not appear until the next business day. It is a daily snapshot, not a live tracker, and it does not forecast an approval or issuance date. Use your notice and examiner correspondence for details.

The status site covers active permits that are ten years old or less from the date of application, and permits closed or cancelled for no longer than one month. It also shows Rental Renovation Licence information and the status of Preliminary Zoning Review applications. If you cannot find a record, check the application number format, try the address another way, or contact the assigned examiner.

What should I do when the status says Notice Sent?

“Notice Sent” means the examiner has identified deficiencies or outstanding items and is waiting for your response. Read the full notice, list every item, and prepare revised drawings or supporting information that answer each one. Then resubmit through the channel described on the Plan Review Process page.

According to the City’s Plan Review Process page (accessed November 10, 2026):

  • Additional or revised drawings and supporting documentation are submitted through the Toronto Building Online Services File Submission Hub, using the application number and access code from the intake email. If you cannot find the access code, the plan review page says to contact your assigned examiner.
  • Only one drawing submission is accepted at a time. Drawings should be combined into a single PDF that follows Toronto Building’s Electronic Submission Guidelines.
  • Revision bubbles should show where changes were made, and only revised pages need to be resubmitted.
  • Once a resubmission is uploaded, no further drawings can be uploaded until the assigned examiner accepts that submission.
  • For supporting documentation, the page says to email the assigned examiner with the application number and address in the subject line.

If the status is “Refusal Notice”, the glossary advises addressing all items in that notice before a response is submitted to the examiner. After you respond, the status will typically move to “Response Received” and then “Response Accepted” when the application returns to the review queue.

Which reviews can a Toronto building permit application go through?

Toronto Building describes up to four examinations: zoning review, Building Code review, mechanical plans examination where applicable, and fire prevention examination for some applications with fire protection systems. If the application complies, a permit is issued. If not, a notice is issued explaining why the project does not comply.

  • Zoning review: land and building use, building size or density, building location on the lot, lot size, parking and height. The zoning examiner also checks applicable law, such as the Planning Act and the Ontario Heritage Act.
  • Building Code review: compliance with the Ontario Building Code, including health and safety, fire protection, structural sufficiency, construction materials, and plumbing and mechanical systems.
  • Mechanical plans examination (if applicable): HVAC, plumbing, drainage and private sewage system requirements of the Ontario Building Code.
  • Fire prevention examination: for some multi-family residential, commercial, industrial and institutional applications with fire protection systems, review against the Ontario Fire Code.

If a project cannot comply with the Zoning By-law, the plan review page notes that the owner may apply to the Committee of Adjustment for a minor variance before proceeding with the building permit.

Why can a permit status stay unchanged for a while?

A status reflects the stage the record is in, not daily activity on the file. An application can show “Not Started” until review begins, “Under Review” while examiners work, “Notice Sent” until a response arrives, or “Issuance Pending” while other approvals or fees are outstanding. Toronto Building does not publish a date for each change.

A few statuses depend on the applicant. “On Hold” points to missing information, and “Notice Sent” waits for your response. “Cancellation Pending” applies when an application has been dormant for over five months; the glossary says it will be cancelled without further notice if no response is received within a month of the cancellation notice.

What helps avoid repeat examiner comments?

Repeat comments usually come from incomplete or inconsistent drawings and from responses that skip an item. Submit a complete, coordinated set, answer every comment in the notice, mark each change with a revision bubble, and make sure architectural, structural and mechanical sheets show the same dimensions, levels and notes.

  • Write a short response letter that lists each comment and states where and how it was addressed.
  • Check that revised pages agree with the pages you are not resubmitting.
  • Include calculations, product information or reports the examiner asked for, rather than referring to them as “to follow”.

For an overview of the steps before and after you apply, see our Toronto building permit guide and our building permit process guide for Toronto.

When does an engineer help with a Toronto permit review?

An engineer helps when the drawings need engineering input or a notice raises structural, mechanical or other technical items. Elmid Design Inc. prepares and revises engineering drawings and written responses within an agreed scope. We do not file or track the application on the owner’s behalf unless that is agreed, and Toronto Building makes the permit decision.

Elmid Design Inc. holds a Certificate of Authorization from Professional Engineers Ontario. That authorization, and hiring any consultant, does not guarantee approval or a review date.

Learn more about our building permit drawing services and how we handle building permit revisions in Toronto, or contact us to discuss the scope for your project.


Frequently asked questions

Can I search Toronto permit status by address instead of a permit number?

Yes. The City’s Building Application Status search accepts a property address or a partial or complete application/permit number. You can also locate the property on the search map. Select the matching record to see its status.

Toronto Building says the status site covers active permits ten years old or less from the date of application, and permits closed or cancelled for no longer than one month. Information is updated as of the previous business day. Check the number and address, then contact the assigned examiner if the record is still missing.

What is the difference between Response Received and Response Accepted?

“Response Received” means a response to a notice has been submitted to Toronto Building. “Response Accepted” means the response has been submitted and the application is back in the review queue.

What does Ready for Issuance mean?

The City’s glossary says the review is complete and the permit is ready for issuance at any time. Mechanical or plumbing permits related to a building permit may have to be issued together.

Does Permit Issued mean the City file is finished?

No. After issuance, the permit moves to inspections. Toronto Building says property owners must schedule a final inspection when the project is complete to close the permit, and that open permits may complicate future real estate transactions or permit applications.

Does the status search show when my permit will be issued?

No. The status search shows the current stage of the application as of the previous business day. It does not give a forecast date. For timing questions, contact the assigned examiner through the application correspondence.

Can an engineer guarantee permit approval or a faster review?

No. An engineer can prepare complete drawings and clear responses to technical comments within an agreed scope. Toronto Building controls its review and the permit decision, so no consultant can promise approval or a review date.


Sources


Geographic Locations That We Service:

Our Licensed Professional Engineers specializing in Engineered Site Grading Plans prepare the engineered site grading plan, lot grading and erosion plan, and drainage plan to obtain site plan approval and building permits in Ontario, including a wide range of municipalities. Each area boasts unique features and requirements, making our tailored approach essential for success.

Toronto and Surrounding Areas

In the vibrant heart of Ontario, we service Toronto (City of Toronto) and surrounding areas. Additionally, we cover Oshawa (City of Oshawa), Pickering (City of Pickering), and Clarington (Municipality of Clarington). Furthermore, our expertise extends to Ajax (Town of Ajax), Whitby (Town of Whitby), Brock (Township of Brock), Scugog (Township of Scugog and Uxbridge (Township of Uxbridge). 

Halton Region

Moving to the Halton Region, our services encompass Burlington (City of Burlington) and Halton Hills (Town of Halton Hills). Also included are Milton (Town of Milton) and Oakville (Town of Oakville). 

Peel Region

In the Peel Region, we provide services in Brampton (City of Brampton), Mississauga (City of Mississauga), and Caledon (Town of Caledon). 

York Region

Our services in the York Region cover Vaughan (City of Vaughan), Aurora (Town of Aurora), and East Gwillimbury (Town of East Gwillimbury). We also cater to Georgina (Town of Georgina), Markham (City of Markham), Newmarket (Town of Newmarket), Richmond Hill (City of Richmond Hill), Whitchurch-Stouffville (Town of Whitchurch-Stouffville), King (Township of King), and Bradford-West Gwillimbury (Town of Bradford-West Gwillimbury). Each municipality here offers a distinct setting, requiring our specialized approach.

Other Southern Ontario Cities and Towns

We also serve many other cities and towns in Southern Ontario. These include Hamilton (City of Hamilton), St. Catharines (City of St. Catharines), Niagara on the Lake (Town of Niagara on the Lake), Brant (County of Brant), Cambridge (City of Cambridge), Kitchener (City of Kitchener), Waterloo (City of Waterloo), and Woodstock (City of Woodstock). Furthermore, we operate in Guelph (City of Guelph), Centre Wellington (Township of Centre Wellington), Shelburne (Town of Shelburne), Orangeville (Town of Orangeville), New Tecumseth (Town of New Tecumseth), Essa (Town of Essa), Collingwood (Town of Collingwood), Wasaga Beach (Town of Wasaga Beach), Barrie (City of Barrie), Midland (Town of Midland), Orillia (City of Orillia), Ramara (Town of Ramara), Minden Hills (Town of Minden Hills), North Kawartha (Town of North Kawartha), Kawartha Lakes (City of Kawartha Lakes), Peterborough (City of Peterborough), Selwyn (Town of Selwyn), and Brighton (Municipality of Brighton).

Share This Guide

Related Engineering Guides

Contact Elmid Design Inc.

Let’s discuss
your project.

Engineering design services across Toronto, the GTA and Ontario.

Contact Elmid Design Inc. for engineering and design support. Tell us about your property and proposed work so we can help identify the next steps.

Contact Us graphic with email and phone symbols over an engineering site plan.

Supporting projects in Toronto and other communities across the GTA and Ontario.

A CLEAR FIRST STEP

Contact Our Engineering Team

Share what you have now. You don’t need a complete drawing package to start.

Scroll to Top
Planning a project? Speak with our engineering team. ☎ (647) 745-4507✉ info@elmid.ca Request a Proposal →