A dry well, also called a soakaway pit or infiltration gallery, is a buried bed of clear stone that stores roof water and lets it soak into the soil. On a house lot it is usually a long rectangular stone trench wrapped in filter fabric and fed by a pipe from the downspout. An engineer sizes it for the roof area it drains and the soil, and keeps it above the groundwater and away from the foundation. It is shown on a stormwater management report or grading plan when the municipality asks for one.

Prepared by Elmid Design Inc. · Reviewed by Hamid Akbari, P.Eng.
Free quote for a dry well design: tell us about the lot and the project through our contact form, or call (647) 745-4507. We reply by email so you can send your survey, drawings and any soil report.
Soakaway pits come up on house rebuilds, additions and infill lots where the street storm sewer is near capacity, where there is no good outlet for the lot, or where the municipality wants the first part of each rainfall kept on site. They also come up when a homeowner wants to stop a downspout from flooding a side yard. The questions are the same in each case: will the soil take the water, how big must the pit be, where can it go, and what happens when it is full.
This guide explains the Building Code rules, what an engineer considers in the design, the municipal requirements in places such as Oakville, and who does what. It is written for homeowners, builders and architects who have been asked for one on a permit or grading drawing.
What is a dry well?
A dry well is a buried storage bed that collects clean stormwater, usually from roof downspouts, and releases it slowly into the surrounding soil. Elmid’s typical residential design is a long rectangular trench of clear stone wrapped in non-woven geotextile, with a horizontal perforated pipe inside, an observation well, and an overflow for large storms.
Engineers use several names for the same idea: soakaway, soakaway pit, infiltration gallery or infiltration trench. The Ontario low impact development (LID) guide published by Toronto and Region Conservation and Credit Valley Conservation groups them together: all store water in the voids of the stone and let it infiltrate into the native soil.
In Elmid’s typical detail, a solid PVC pipe runs underground from the downspout at a slope of at least 2% toward the gallery, with a detachable section at the downspout for clean-out and an overflow pipe to a concrete splash pad. Inside the trench, a perforated pipe carries the water along the full length of the stone. A capped observation pipe rises from the trench bottom to the lawn so the owner or a reviewer can see whether the gallery drains. Topsoil and sod or seed cover the top.
Prefabricated plastic infiltration chambers set in clear stone are an alternative on some lots.
A dry well is not a septic leaching bed and does not take sewage, laundry or wash water. It is also not a source of drinking water. Keep it clear of both.
Watch: how a dry well works
This short animation follows roof water from the downspout through a solid pipe and a perforated pipe into the stone gallery, where it soaks into the soil, with the overflow to a splash pad in a big storm.
Does the Ontario Building Code allow a dry well?
Yes. Article 9.14.5.1 of the 2024 Building Code lets foundation drains discharge to a sewer, a drainage ditch or a dry well. For those dry wells, Article 9.14.5.3 requires the groundwater to be below the bottom and a distance of at least 5 m from the foundation. A soakaway for roof water alone follows the municipal standard.
These rules are in Part 9 of the 2024 Building Code (O. Reg. 163/24, in force since January 1, 2025). Article 9.14.5.3, “Dry Wells”, has two sentences:
- Sentence (1): dry wells may be used only where the natural groundwater level is below its bottom.
- Sentence (2): dry wells must be not less than 5 m from the building foundation and located so that drainage is away from the building.
Article 9.14.5.2 adds that where gravity drainage is not practical, an automatic sump pump discharges the sump pit water to a sewer, drainage ditch or dry well. Article 9.14.6.1 requires the site to be graded so water does not collect at the building and does not adversely affect adjacent properties. Article 9.14.6.2 directs surface drainage away from a water supply well or a septic leaching bed.
These Articles sit in Subsection 9.14.5, Drainage Disposal, which deals with water from foundation drains. The Code sets where such a dry well may go but does not size it. A soakaway that takes only roof water is governed by the municipality’s engineering standards and the engineer’s design.
When does a municipality ask for a dry well?
A municipality usually asks for a dry well when added roof and paved area would increase runoff, when the storm sewer downstream is at or near capacity, or when the lot has no defined outlet. Rebuilds, additions and infill houses are the common triggers. Each municipality sets its own rules, so check the local engineering standards.
Oakville is a clear example: its October 2026 requirements apply to every new build or tear-down and rebuild, and to smaller permits only when set triggers apply.
Other GTA municipalities handle it through their own lot grading criteria, site alteration by-laws or site plan conditions. A Toronto lot, a Vaughan lot and a Caledon lot can each get a different answer, so the first step is always the local standard. Our retention vs detention guide explains how volume control differs from slowing flow.
How is a dry well sized?
An engineer sizes a dry well from the roof area that drains to it, the design rainfall the municipality sets, the storage space between the stones and how quickly the native soil absorbs water, measured by a percolation or infiltration test. The aim is a gallery that empties within the drawdown period the municipality and the Ministry’s stormwater guidance expect.
Driveway runoff can carry sediment and salt, so a soakaway normally takes clean roof water only. A long trench suits most house lots: the bottom stays level and above the groundwater, and the water spreads over more soil. The design also sets where water goes when a storm is larger than the gallery holds.
| Design input | What it controls | Where it comes from |
|---|---|---|
| Connected roof or paved area | How much water reaches the gallery | Architectural drawings and site plan |
| Design rainfall | How much the gallery must hold | Municipal engineering standard |
| Native soil percolation rate | How quickly the gallery empties | Field test at the proposed depth |
| Seasonal high groundwater | How deep it can go | Soil report, test pits or borehole records |
| Setbacks | Where it can sit on the lot | Municipal standard; Building Code 9.14.5.3 for foundation drainage; wells and septic beds |
| Overflow route | What happens in a large storm | Grading plan: swale, splash pad or storm connection |
What soil test does a dry well need?
A dry well needs a field test of how quickly water soaks into the native soil at the depth of the well bottom, such as a percolation test or an in-situ infiltration test. Many municipalities ask for the test in the engineer’s report. Clay soils often infiltrate too slowly, so the result decides whether a dry well works at all.
The Ontario LID guide says the native soil infiltration rate at the proposed location and depth should be confirmed by in-situ measurements under field saturated conditions. A test hole beside the house tells you little if the pit will sit at the back of the lot in different soil.
The engineer does not use a measured rate as is, because stone and soil clog over time. Our article on infiltration testing explains why.
Elmid does not dig test pits. A geotechnical consultant or a testing contractor you hire carries out the field test; we use the result in the design.
How far must a dry well be from the house?
For a dry well that receives foundation drainage, Article 9.14.5.3 of the 2024 Building Code sets at least 5 m from the building foundation, with drainage away from the building. For a soakaway that takes only roof water, the municipality’s standard governs and often sets a similar distance, so check the local requirement.
The LID guide recommends at least 4 m from foundations for infiltration facilities in general. Elmid’s typical detail keeps the gallery at least 5 m from the house, and clear of property lines, drinking-water wells and septic beds.
On a narrow infill lot, the setback often decides the location: the gallery usually ends up in the rear yard, sometimes the front yard, and rarely in a side yard. Keep it away from the neighbour’s lot so the water does not resurface on their side, and clear of tree roots the arborist wants to protect.
How deep can a dry well be above the groundwater?
The Building Code allows a dry well only where the natural groundwater is below its bottom. The Ontario LID guide recommends at least 1 m between the base of an infiltration facility and the seasonally high water table or bedrock. A soil report or test pit in spring conditions shows where the water table sits.
If groundwater is high, a soakaway can fill from below and stop working, or push water back toward the foundation. On such sites, a shallow infiltration trench, a rain garden, a cistern or controlled discharge to the storm sewer may suit the lot better. The engineer chooses with the municipality’s requirements in mind.
How long should a dry well take to drain?
Drawdown time is set by the municipality or the design standard. The Ministry of the Environment’s 2003 stormwater manual uses 24 to 48 hours for soakaway pits, and local criteria can differ. A gallery that drains too slowly is still full when the next storm arrives, so it cannot take that water.
On slow soil, the engineer can change the shape of the gallery, connect less roof to it, or choose a different solution.
What does Oakville require for a dry well?
Oakville’s Residential Infill Stormwater Management Requirements (October 2026) say every new build or tear-down and rebuild must retain the first 25 mm of rain on site from all impervious surfaces, with infiltration preferred. Pools, additions, accessory structures and detached garages need it only when set triggers apply, sized for the new impervious area.
The triggers for those smaller permits are no functional drainage outlet, total lot coverage above 30% of the lot, or post-development impervious coverage above 65%. Where soil conditions make infiltration impractical, the Town may consider alternatives, with storage sized to control 100-year post-development flows to 5-year pre-development levels.
A geotechnical report is the preferred soil information. Where one is not feasible, the Town accepts, in order of preference, an in-situ test, nearby Ontario borehole records with a conservative rate, or a nearby in-situ test, and asks for groundwater, bedrock and soils to be verified in the field during construction. Our Oakville guide to grading near property lines and dry wells covers the Oakville side in more detail.
What happens when a dry well is full?
When a storm is larger than the design event, the dry well fills and the extra water must leave by an overflow. The overflow spills to a swale, a splash pad or a storm connection, and the grading plan shows it so water never flows toward the house or the neighbour.
The LID guide notes that overflow outlets should be sized for large event flows and placed below the frost line where they must work year round. The observation well, a capped pipe from the trench bottom to grade, lets the owner or a reviewer see whether the gallery is draining.
Our guide to drainage swales on a lot grading plan shows how overflow is routed across a lot.
Can a sump pump discharge to a dry well?
Yes, where the Code and the municipality allow it. Article 9.14.5.2 of the 2024 Building Code lets a sump pump discharge foundation drain water to a sewer, drainage ditch or dry well. Many municipalities prefer discharge to grade on a splash pad, and a constant sump flow can overload a dry well sized only for rain.
A sump that runs often signals high groundwater, the opposite of what a soakaway needs, so the engineer checks the sump history first.
Who designs and who builds a dry well?
Elmid Design prepares the design, the permit drawings and the permit application to the City or Town, with the stormwater report and the grading plan. A geotechnical consultant tests the soil. A landscaping or excavation contractor you hire builds the gallery, and the municipality reviews the design and inspects the finished work.
The drawings carry notes for the contractor: excavate with light equipment so the trench bottom is not compacted, keep the bottom level and free of debris, wrap the stone in non-woven geotextile with overlaps, place clean washed stone in lifts, and build the gallery after the site is stabilized, protected from sediment. Where the municipality requires a review after construction, Elmid offers it. We do not excavate, supply materials or build the gallery.
How much does a dry well cost?
Costs depend on the site: the soil, the groundwater, the connected area, access for digging, and what the municipality requires in the report. Construction is priced by the contractor who builds it. For the design, Elmid prepares a written proposal after reviewing the scope; the consultation and the quote are free.
What should you send for a dry well design?
To prepare a proposal and then the design, Elmid usually asks for:
- the property address and municipality, and the permit or site alteration application number if there is one;
- a current topographic survey prepared by an Ontario Land Surveyor;
- the architectural site plan and roof plan, so the connected roof area can be measured;
- any soil report, test pit log or infiltration test result;
- the municipality’s comments, if it was requested in a review;
- photos of the yard, the downspouts and any area where water ponds.
Elmid reviews these documents first. The drawings are prepared from the survey and the architectural plans; site work by Elmid is limited to the inspections the municipality requires.
Related articles
- Stormwater infiltration testing and design rates in Ontario
- Oakville lot grading and drainage plans by a P.Eng.
- Stormwater retention vs detention in Toronto
Sources
- Government of Ontario, 2024 Building Code Compendium, Part 9: Housing and Small Buildings (O. Reg. 163/24), Subsection 9.14.5 (Articles 9.14.5.1, 9.14.5.2, 9.14.5.3) and 9.14.6, page modified October 20, 2026, accessed November 24, 2026.
- Ontario Ministry of the Environment, Stormwater Management Planning and Design Manual (2003), section 4.5.6, Roof leader discharge to soakaway pits (drawdown time), accessed November 24, 2026.
- Toronto and Region Conservation Authority and Credit Valley Conservation, Low Impact Development Stormwater Management Planning and Design Guide: Infiltration chambers (Sustainable Technologies Evaluation Program wiki), accessed November 24, 2026.
- Town of Oakville, Stormwater Management Requirements, Residential Infill Development Engineering Permit Applications (PDF dated October 19, 2026), accessed November 24, 2026.
This article is general information for Ontario, not design advice for a specific property. Soakaway requirements differ by municipality; confirm the current standards with your municipality before design and construction.
Geographic Locations That We Service:
Our Licensed Professional Engineers specializing in stormwater management and Engineered Site Grading Plans prepare dry well and infiltration gallery designs, stormwater management reports, lot grading, erosion and drainage plans to obtain site plan approval and building permits in Ontario, including a wide range of municipalities. Each area has its own soils, drainage outlets and requirements, so the design is tailored to each one.
Toronto and Surrounding Areas
In the vibrant heart of Ontario, we service Toronto (City of Toronto) and surrounding areas. Additionally, we cover Oshawa (City of Oshawa), Pickering (City of Pickering), and Clarington (Municipality of Clarington). Furthermore, our expertise extends to Ajax (Town of Ajax), Whitby (Town of Whitby), Brock (Township of Brock), Scugog (Township of Scugog), and Uxbridge (Township of Uxbridge).
Halton Region
Moving to the Halton Region, our services encompass Burlington (City of Burlington) and Halton Hills (Town of Halton Hills). Also included are Milton (Town of Milton) and Oakville (Town of Oakville).
Peel Region
In the Peel Region, we provide services in Brampton (City of Brampton), Mississauga (City of Mississauga), and Caledon (Town of Caledon).
York Region
Our services in the York Region cover Vaughan (City of Vaughan), Aurora (Town of Aurora), and East Gwillimbury (Town of East Gwillimbury). We also cater to Georgina (Town of Georgina), Markham (City of Markham), Newmarket (Town of Newmarket), Richmond Hill (City of Richmond Hill), Whitchurch-Stouffville (Town of Whitchurch-Stouffville), King (Township of King), and Bradford-West Gwillimbury (Town of Bradford-West Gwillimbury). Each municipality here offers a distinct setting, requiring our specialized approach.
Other Southern Ontario Cities and Towns
We also serve many other cities and towns in Southern Ontario. These include Hamilton (City of Hamilton), St. Catharines (City of St. Catharines), Niagara on the Lake (Town of Niagara on the Lake), Brant (County of Brant), Cambridge (City of Cambridge), Kitchener (City of Kitchener), Waterloo (City of Waterloo), and Woodstock (City of Woodstock). Furthermore, we operate in Guelph (City of Guelph), Centre Wellington (Township of Centre Wellington), Shelburne (Town of Shelburne), Orangeville (Town of Orangeville), New Tecumseth (Town of New Tecumseth), Essa (Town of Essa), Collingwood (Town of Collingwood), Wasaga Beach (Town of Wasaga Beach), Barrie (City of Barrie), Midland (Town of Midland), Orillia (City of Orillia), Ramara (Town of Ramara), Minden Hills (Town of Minden Hills), North Kawartha (Town of North Kawartha), Kawartha Lakes (City of Kawartha Lakes), Peterborough (City of Peterborough), Selwyn (Town of Selwyn), and Brighton (Municipality of Brighton).