A drainage swale on a lot grading plan is a shallow, grassed channel that carries surface water away from houses to the street, a rear-lot catch basin or another approved outlet. In a new subdivision, one shared swale is usually centred on the lot line under the subdivision’s approved plan. On an infill lot, each lot needs its own swale on its own side of the property line, so two houses have two swales with the lot line between them. Municipal criteria usually call for a longitudinal slope of at least 1.5% to 2%, side slopes no steeper than about 3:1 and a depth of roughly 150 to 300 mm, but the numbers vary by municipality; confirm them with yours.

Prepared by Elmid Design Inc. · Reviewed by Hamid Akbari, P.Eng.
The image at the top of this page is illustrative only: it shows an infill side yard with two separate grassed swales, one on each lot with the property line between them, and arrows for the direction of surface flow. It is not a project drawing and shows no design values.
Elmid Design Inc. is an engineering consultant. We prepare these plans and, where the municipality requires it, carry out the field review for a grading certificate. A contractor or landscaper you hire builds the work, and the municipality makes the approval decisions.
What is a drainage swale on a lot grading plan?
A drainage swale is a shallow, sloped channel shaped into the lawn to collect surface runoff and carry it to an outlet. On the plan it is drawn as a line with flow arrows and spot elevations, so anyone can see where water collects, which way it flows, and where it leaves the property.
The City of Brampton describes swales as “shallow, sloped channels that convey surface drainage towards a City right-of-way and storm sewer system”. On most residential lots, this channel is the main route that keeps roof and lawn water away from foundations.
How is a swale shown on a grading plan?
The drawing shows a swale with a centreline, flow arrows, a percentage slope and spot elevations at the high point and the outlet. A cross-section detail usually gives the depth and side slopes. Reading these together tells you whether water can actually reach the outlet without ponding.
- High point: the elevation where the channel starts; water flows away from it in one or two directions (split drainage).
- Slope arrows and percentages: the direction of flow and the longitudinal grade, for example 2.0%.
- Spot elevations: proposed levels along the channel, at the property line and at the outlet, usually beside the existing levels.
- Outlet: the street, a rear-lot catch basin, a ditch or another approved feature.
- Typical section: a small cross-section with the depth, bottom width if any, and side slopes such as 3:1.
Our guide on how to read a grading plan explains elevations, slopes and symbols in more detail, with a labelled example.
What slope does a drainage swale need in Ontario?
It depends on the municipality. Toronto’s infill criteria say swale slopes should not be less than 1.5%. Mississauga and Vaughan set a 2% minimum, and Vaughan asks for 3% between houses less than 1.8 m apart. There is no single provincial number, so confirm your municipality’s current criteria before design.
Published criteria, checked on November 20, 2026, apply only to their own type of development and can change; treat the table as a guide to the range.
| Municipality and document | Swale slope | Depth and side slopes | Other rules |
|---|---|---|---|
| Toronto (infill housing not subject to subdivision or site plan approval) | Not less than 1.5%; side yards drained at not less than 1.5% to existing positive outlets | Terrace and swale side slopes not over 33% (about 3:1) | Rear yard slope not over 10% where grades are altered; front average slope to curb 2% to 6% |
| Mississauga (subdivision design requirements) | Minimum 2% | Side slopes maximum 3:1; side-yard swale depth 150 to 250 mm (450 mm allowed where the combined side yard is more than 3.6 m); rear-yard swale 150 to 450 mm | Rear-yard swale to a rear-lot catch basin limited to three lots (frontage under 12 m) or two lots (12 m and over) |
| Vaughan (individual lot plans, including infill) | 2% to 5%; minimum 3% for side-yard swales where houses are less than 1.8 m apart | Depth desirable 250 mm, minimum 150 mm, maximum 300 mm | Channel centre at least 600 mm from any foundation wall; infill: 600 mm undisturbed strip along all property lines, no grade changes within 600 mm of lot boundaries |
| Pickering (infill and individual lots) | Not covered in this summary | Not covered in this summary | Side-yard swale on the common lot line between two new lots; beside an existing developed lot, built fully within the lot |
| Oakville (infill guide) | Per the Town’s engineering guidelines | About 150 to 300 mm deep, 1 to 2 m wide, side slopes no steeper than 3:1 | Swales must not spill onto adjacent properties; site drainage is to be self-contained; match the neighbour’s grade at the property line |
| Brampton (homeowner guidelines for subdivision lots) | Not stated in the homeowner guide; set on the approved lot plan | Not stated in the homeowner guide | Property line swales are typically shared between subdivision lots; do not change a swale’s grade or build in it |
A channel that is too flat holds water after rain, and small settlements create low spots. Steeper is not always better: Vaughan caps the grade at 5%, because fast water can erode the channel.
Ontario’s Building Code sets the outcome rather than a number. Article 9.14.6.1 of Division B of the 2024 Building Code (O. Reg. 163/24, in force January 1, 2025) requires that the building be located or the site graded so that water will not accumulate at or near the building and will not adversely affect adjacent properties.
How deep should a side-yard swale be?
Most published criteria put a residential side-yard channel between 150 mm and 300 mm deep. Vaughan asks for a desirable 250 mm, a minimum of 150 mm and a maximum of 300 mm. Mississauga’s subdivision requirements allow 150 to 250 mm, or up to 450 mm where the combined side yard is wider than 3.6 m.
A deep, narrow channel is harder to maintain and can bring the swale bottom close to the foundation. Vaughan also says the centre of the channel must be at least 600 mm from any foundation wall.
Side slopes matter as much as depth. With 3:1 side slopes, a 150 mm deep channel needs roughly 0.9 m of width, and a 250 mm one about 1.5 m. On an infill lot that width has to fit on your own side of the property line, between the foundation and the strip kept undisturbed along the lot line, so narrow side yards are often the deciding factor.
Is a side-yard swale shared, or does each lot need its own?
It depends on the type of project. In a new subdivision, one shared channel centred on the common lot line is allowed under the subdivision’s approved lot plan. On an infill lot, each lot needs its own independent swale on its own side of the property line, so the lot drains on its own land without relying on the neighbour.
Pickering states the rule directly: side-yard swales are located on the common lot line between two new lots, unless the side yard is next to an existing developed lot, in which case it is to be fully constructed within the lot. Vaughan’s infill section asks for a 600 mm undisturbed area along all property lines and does not permit grade changes within 600 mm of lot boundaries. Oakville’s infill guide says swales must convey runoff away from the site without spilling onto adjacent properties, and that site drainage is to be self-contained.
Elmid’s engineering guidance, reviewed by Hamid Akbari, P.Eng., is to design an independent channel on each infill lot, so a side yard between two houses has two swales with the lot line between them. The new levels meet the neighbour’s existing grades at the line instead of reshaping them. Confirm the requirement with your municipality.
In a subdivision, one shared channel serves both lots. Brampton’s homeowner guide notes that property line swales are typically shared, says to consult your neighbour if it is blocked, and says it is an offence to block an approved drainage channel.
Where does the water in a swale go?
It must end at an outlet that can take the water: usually the street, a rear-lot catch basin, a ditch or another feature approved by the municipality. The plan shows the outlet with its elevation. Municipal criteria often limit how much area may drain to one channel or onto the road.
Vaughan, for example, limits the area draining to any rear or side-yard swale or catch basin to 750 m², and the area that may discharge onto a road allowance to 500 m² (200 m² where flow crosses a sidewalk). Mississauga limits how many lots a rear-yard swale may serve before it reaches a rear-lot catch basin.
What commonly goes wrong with swales?
Most swale problems come from later changes to the yard: a shed, fence footing, raised bed, pavers or added soil placed in the channel, or a downspout pointed at the neighbour. The original design may have worked, but the channel no longer has a continuous slope to its outlet.
- Ponding after rain at a flat spot, a low point or a blocked section.
- Structures in the channel, which Brampton says homeowners should not build, such as a storage shed or raised flower bed.
- Regraded yards that change the channel’s slope, which Brampton also advises against.
When do you need an engineer for a swale?
You need a qualified grading consultant when a building permit or municipal approval requires a grading plan, for example for a new house, an addition, a pool or a regraded yard, and when a drainage problem involves levels, outlets or a neighbouring lot. An engineer is the right choice where drainage design, not just measurement, is needed.
In Toronto, the infill grading plan is prepared, sealed, signed and dated by a “Grading Consultant”, who then gives field review and issues a final Lot Grading Certificate. Toronto accepts an Ontario Land Surveyor, a P.Eng., an architect, a landscape architect or a certified AATO or OACETT member in that role. Other municipalities set their own lists, so ask which professionals they accept.
An engineer adds the most value when the channel has to do real work:
- tight side yards where the channel, foundation clearances and the slope away from the house compete for space;
- infill lots where the new channel must fit on your side of the property line and meet the neighbour’s existing grades;
- rear-lot catch basins, walkouts, pools or long swales that serve several lots;
- sites where drainage must stay on the lot, or where the outlet is uncertain.
Legal boundaries are a separate matter. An Ontario Land Surveyor confirms property lines and easements; the engineer designs the levels using that survey. See our page on site grading plans for what Elmid prepares.
Who does what on a swale project?
The grading consultant designs the channel and the levels around it, the surveyor provides the base information, the contractor or landscaper builds it, and the municipality reviews the plan and, where it applies, the final grading certificate. Owners then keep it clear and unchanged.
- Ontario Land Surveyor: topographic survey, property lines and easements.
- Grading consultant (Elmid, as engineer): lot plan, channel slopes and sections, outlets, coordination with adjacent grades, and field review for the grading certificate where required.
- Contractor or landscaper: builds the swales, splash pads and sod.
- Municipality: reviews the plan, inspects or accepts the certificate, and enforces drainage by-laws.
- Owner: keeps swales clear, and asks before changing grades along a property line.
Elmid is not a contractor and does not excavate, regrade or install drainage.
What should you send Elmid to start a grading plan with swales?
Send the property address and municipality, a current topographic survey, the architectural site plan or concept, and any municipal comments you have received. Photos of the side yards and of the neighbouring grades help. With these, Elmid can confirm the scope and prepare a written proposal.
- Survey: current topographic survey with property lines, existing grades and neighbouring levels along the property lines.
- Design drawings: site plan, floor plans and finished floor levels, or a concept sketch.
- Drainage information: downspout, sump and walkout locations, and any known ponding.
- Municipal records: approved lot plans for the subdivision, if available, and any review comments.
Frequently asked questions
What is the minimum slope for a drainage swale in Ontario?
There is no single provincial minimum. Toronto’s infill grading criteria say swale slopes should not be less than 1.5%, while Mississauga and Vaughan set 2%, and Vaughan asks for 3% where houses are less than 1.8 m apart. Check the current criteria of the municipality where the property is before design or regrading.
How deep should a side-yard swale be?
Typically 150 to 300 mm. Vaughan asks for a desirable depth of 250 mm, with a minimum of 150 mm and a maximum of 300 mm. Mississauga’s subdivision requirements allow 150 to 250 mm for side-yard swales, or up to 450 mm where the combined side yard is wider than 3.6 m. Requirements vary by municipality; confirm with yours.
Can I build a shed or raised garden bed in a swale?
Generally no. The City of Brampton tells homeowners not to change the grading or slope of a swale and not to build a permanent structure in it, such as a storage shed or raised flower bed, and says it is an offence to block an approved drainage channel. Check your own municipality’s rules before changing a swale.
Can an infill house share a side-yard swale with the neighbour?
Generally no. A shared swale centred on the lot line belongs to a new subdivision, under its grading plan. On an infill lot, each lot needs its own swale on its own side of the property line. Pickering, for example, requires a swale beside an existing developed lot to be fully within the lot. Confirm your municipality’s rule before design.
Does a swale need an engineer?
A swale that is part of a new house, addition, pool or regrading usually appears on a grading plan prepared by a qualified grading consultant. Toronto accepts surveyors, engineers, architects, landscape architects and certified technologists for infill plans. An engineer is the right choice where outlets, tight side yards or neighbouring grades need drainage design.
How much does a grading plan with swale design cost?
Costs depend on the site and scope: the lot size, the number of swales and outlets, the neighbouring grades and what the municipality requires. Elmid prepares a written proposal after reviewing your survey and drawings, and offers a free consultation and a free quote. Elmid designs the grading; a contractor builds it.
Areas we serve
Elmid Design Inc. prepares grading plans and stormwater management reports in Toronto and across the Greater Toronto Area, including York, Peel, Halton and Durham regions, and in other Ontario municipalities, depending on project scope and availability. Contact us to discuss your project.
Related articles
- How to read a grading plan
- Rear-lot catchbasin grading in Richmond Hill
- Grading certificate in Toronto
Sources
- City of Toronto, Lot Grading Requirements for Infill Housing (page dated November 17, 2017; minimum requirements 2, 3 and 5; grading consultant list), accessed November 20, 2026.
- City of Mississauga, Section 2: Development Design Requirements (subdivision design; Sections 2.3.0 and 2.3.3 Swales), accessed November 20, 2026.
- City of Vaughan, Section 2.2 Lot Grading: Individual Lot Grading Plans (Section 2.2.5 Swale Design; Section 2.2.9 Infill Residential Construction), accessed November 20, 2026.
- City of Brampton, Residential Surface Drainage Lot Grading Guidelines, accessed November 20, 2026.
- City of Pickering, Infill Lot Grading and Individual Lot Grading (Sections 6.4 and 6.5), accessed November 20, 2026.
- Town of Oakville, Grading and Servicing Plan Guide for Residential Infill Developments (August 2023; swale definition, items 2.5 and 2.28, self-contained site drainage), accessed November 20, 2026.
- Government of Ontario, 2024 Building Code Compendium, Part 9 (Division B, Article 9.14.6.1 Surface Drainage; O. Reg. 163/24, in force January 1, 2025), accessed November 20, 2026.
This article is general information, not advice for a specific property. Municipal grading criteria differ and change over time; confirm current requirements with your municipality before you design or regrade.