North York building permits are issued by the City of Toronto. Toronto Building’s North York District office is at the North York Civic Centre, 5100 Yonge Street, and reviews applications for the area. Drawings follow the City’s guide for the project: a new house, an addition, an interior alteration or underpinning. Elmid Design Inc. prepares the design, the permit drawings and the permit application to the City.

Prepared by Elmid Design Inc. · Reviewed by Hamid Akbari, P.Eng.
Free quote for North York permit drawings: tell us about the property and the project through our contact form, or call (647) 745-4507. We reply by email so you can send your survey and architectural drawings.
The image at the top of this page is an AI-generated illustration of a North York-style street. It is not a project photo and shows no design.
This guide is for North York owners, builders and architects planning a replacement house, an addition, a basement project or an interior renovation. It covers the district office, the zoning by-law question, what a new house application needs, trees and ravines, the Committee of Adjustment and who prepares each drawing.
Who issues building permits in North York?
The City of Toronto issues every building permit in North York. The former City of North York joined the amalgamated City in 1998, and Toronto Building now runs one permit process for the whole city through four districts. North York is one of them, so you follow the City of Toronto’s application guides, forms and review.
Searches for a “North York building permit” still turn up old North York forms and addresses. They are out of date. Start from the City of Toronto’s building permit pages, and confirm the property’s district on the City’s map, since North York’s edges meet Etobicoke York, Toronto and East York, and Scarborough.
Toronto’s When Do I Need a Building Permit? page lists what needs a permit, including a new building, an addition such as a second storey, structural alterations, a basement with underpinning, a new entrance or a second suite, and demolition of all or part of a building.
Where is Toronto Building’s North York district office?
Toronto Building’s North York District office is at the North York Civic Centre, 5100 Yonge Street, 1st floor. In-person visits are by appointment and cover general zoning by-law information, booked in the district where the property is. Other questions go to Toronto Building Customer Experience at 416-397-5330 or bldinquiries@toronto.ca.
Each zoning appointment is 30 minutes, and the City’s appointment page asks you to book in the same district as the property. The Committee of Adjustment also has a North York district office, and the City lists a North York planning consultant for development application questions.
Plans and forms for house projects are not handed in at the counter. They are submitted online, as described below.
Does North York still use Zoning By-law 7625?
Sometimes. Most North York properties are under Toronto’s City-wide Zoning By-law 569-2013, but By-law 569-2013 does not yet replace every former by-law, and some properties remain subject to North York Zoning By-law 7625. Toronto Building reviews each application against whichever by-law applies to that property.
The City’s Former Municipal Zoning By-laws page says electronic copies of the original By-law 7625 are on the City’s By-law Status Registry, and consolidated versions are available from the North York district customer counter. Site-specific amendments and exceptions can also apply to a single property.
For a replacement house or an addition, the zoning numbers drive the design: lot coverage, gross floor area, height, setbacks and parking. Confirm them before the architect finishes the plans, not after the first examiner’s notice.
What North York projects need permit drawings?
In North York, common projects are replacement houses on older lots, second-storey and rear additions to bungalows, basement underpinning and second units, removal of load-bearing walls, and garden suites. Each follows a different City application guide, and a replacement house needs the most complete package, including a lot grading plan.
Many North York streets were built with post-war bungalows on generous lots, and many of those lots now carry newer, larger houses. That mix explains the typical work:
- Replacement houses: the original house is demolished and a new one is built on the same lot, which brings in the New House guide, grading, trees and often a variance.
- Second-storey additions: a bungalow keeps its footprint and gains a floor, so the existing walls, beams and foundations must be checked for the new loads.
- Rear additions: the house extends into the rear yard, subject to setbacks, coverage and trees.
- Basement projects: underpinning for headroom, a walkout, or a second unit in an existing house.
- Open-plan renovations: removing a load-bearing wall between the kitchen and living areas.
| Project | City guide | Engineering often involved |
|---|---|---|
| Replacement house | New House | Structural design, lot grading plan, site servicing, HVAC and plumbing |
| Second-storey addition | Small Residential Additions | Structural review of existing walls and foundations, new framing |
| Rear addition | Small Residential Additions | Footings, foundations and framing; grading where drainage changes |
| Underpinning or walkout | Residential Underpinning | Structural design with numbered stages; Professional Engineer where the City’s triggers apply |
| Load-bearing wall removal | Interior Alterations | Beam, posts and supports down to the foundation |
The City’s current guide for the project decides the full list of drawings and forms.
What does a new house permit in North York need?
Toronto’s New House guide asks for a site plan with a zoning summary, a lot grading plan that meets the City’s Lot Grading Criteria for Infill Housing, floor and roof plans, elevations, sections and details, plus forms including the energy design summary, Tree Declaration and the Lot Grading Letter of Undertaking.
The lot grading plan must show grading designed so that construction causes no new ponding on the lot or the neighbouring properties. The Letter of Undertaking applies to new housing that is not subject to subdivision or site plan approval, and the lot grading consultant issues a final Lot Grading Certificate to Toronto Building once the final grades are in.
Other items on a North York rebuild:
- Demolition: demolishing all or part of a building also needs a permit, so plan the removal of the old house with the new house application.
- Public notice: the City requires a Residential Infill Construction Public Notice to be posted on new infill construction and demolition sites, and on additions over 100 m².
- Road damage deposit: the Municipal Road Damage form protects the curb, sidewalk, boulevard and road during construction.
- Overhead conductors: a declaration signed by the designer confirms compliance with the Building Code article on overhead electrical conductors.
- Trusses and engineered floors: Toronto may accept truss and floor joist shop drawings at the construction stage; confirm the timing with the plans examiner.
- Party walls: where a party wall is involved, each property separated by it needs its own permit, filed by its owner or agent.
- Mechanical and plumbing: HVAC, plumbing and drain permits can be submitted online once the new house application has been submitted.
How do trees and the Don River ravines affect a North York permit?
Trees and ravines often decide the footprint of a North York project. Private trees 30 cm or more in diameter and all City street trees are protected, and lots along the Don River valleys and other ravines may be in a Ravine and Natural Feature Protection area, where grading, fill, structures and retaining walls need a City permit.
The City’s tree and ravine permit page says an as-of-right replacement house still needs a tree permit if it would injure or remove a protected tree, and the City may ask for the design to be revised. It also says pools, accessory structures, standalone garages and basements that extend beyond the above-ground footprint are not treated as as-of-right construction for tree permits.
Where a property is in an area the Toronto and Region Conservation Authority (TRCA) regulates, such as near a valley or watercourse, a TRCA permit may also be needed. Check the City’s ravine map and ask the TRCA early, because these approvals can change the building envelope.
On the survey and site plan, show every tree near the work, including the neighbours’ and the street trees, with their diameters. An arborist can confirm the tree protection zones.
When does a North York project go to the Committee of Adjustment?
A North York project goes to the Committee of Adjustment when the design does not meet the zoning by-law, for example a little more floor area, height or coverage than allowed. The Committee can grant a minor variance before the permit is issued. The City recommends a Zoning Applicable Law Certificate to confirm which variances are needed.
The Committee of Adjustment holds hybrid in-person and virtual hearings and publishes hearing agendas by district, with a separate North York schedule. Since November 28, 2022, only the applicant, the Minister and specified persons and public bodies can appeal a decision.
Variances are a planning decision. They do not change Building Code requirements, which Toronto Building still reviews with the permit application. Projects that need variances are outside the City’s Express Services stream.
How do you apply for a building permit in North York?
Apply online through Toronto Building’s Online Services Application Submission tool, choosing the permit type, such as new house, small residential addition, interior alterations or underpinning. Upload every drawing, report and form as a PDF. The tool shows the documents and outside approvals the project needs and lets you follow the submission.
Before submitting, the City’s voluntary AI pre-check can review eligible residential applications, including additions and alterations to houses with two dwelling units or fewer, for missing plans, incomplete forms and possible Code or zoning issues. Using it does not submit the application, and City staff still review every application in full.
Smaller jobs in a house with up to two units, such as interior alterations, underpinning, walkouts and decks, go to the Express Services stream. New houses and additions follow the regular review.
Who prepares each part of the North York drawings?
On a North York rebuild or addition, an architect or a designer with a BCIN usually prepares the architectural set, an Ontario Land Surveyor provides the survey, and engineers prepare the structural design, lot grading and servicing, and HVAC and plumbing. An arborist reports on trees. The contractor builds, and Toronto Building reviews and issues the permit.
Designers who are not engineers or architects show their name, registration number, BCIN and statement of responsibility on the drawings and complete Schedule 1. Drawings sealed by an engineer come with the Assumption of Responsibility for Engineering Content form.
Where Elmid Design Inc. fits:
- Structural design: foundations, framing, beams and lintels for new houses and additions, checks of existing walls and footings for second storeys, and review of truss shop drawings designed by the truss manufacturer’s engineer.
- Grading and servicing: the lot grading plan under the City’s infill criteria, the grading certificate based on our own field review of the finished site, and site servicing drawings.
- HVAC and plumbing: residential mechanical and plumbing design for the related permits.
- Permit and variance drawings: building permit drawings within an agreed scope and Committee of Adjustment packages.
Elmid is not a contractor and does not build, demolish or excavate. Costs depend on the property and the scope; Elmid prepares a written proposal, with a free consultation and a free quote.
What should you gather before starting North York permit drawings?
Start with a current survey showing trees and grades, the architect’s or designer’s drawings or concept, photos of the existing house, and any zoning certificate, variance decision or examiner comments. With these, an engineer can confirm which drawings the project needs and prepare a written proposal for the agreed scope.
- Survey: a current survey with property lines, existing grades, trees with diameters, easements and any ravine limits.
- Design drawings: floor plans, elevations and sections, or a concept if the design is early.
- Existing house: earlier permit drawings and photos of the basement, structure and mechanical room.
- Zoning status: whether By-law 569-2013 or By-law 7625 applies, and any variance decision.
- Neighbours: whether you share a wall, and the location of neighbouring houses and trees near the work.
Please email drawings and photos after first contact, because our contact form does not take attachments.
Related articles
Frequently asked questions
Where do I apply for a building permit in North York?
Apply to the City of Toronto. Most house projects are submitted online through Toronto Building’s Online Services Application Submission tool. Toronto Building’s North York District office is at the North York Civic Centre, 5100 Yonge Street, 1st floor, and offers in-person zoning information by appointment.
Is North York Zoning By-law 7625 still in force?
For some properties, yes. Most of North York is under Toronto’s City-wide Zoning By-law 569-2013, but the City says former by-laws such as North York’s By-law 7625 still apply to some properties, in whole or in part. Check the address on the City’s zoning map or book a district zoning appointment.
Do I need a lot grading plan for a new house in North York?
Yes. Toronto’s New House guide asks for a lot grading plan showing that construction will cause no new ponding on the lot or neighbouring properties, under the City’s Lot Grading Criteria for Infill Housing. The lot grading consultant later issues a Lot Grading Certificate to Toronto Building once final grades are complete.
Do I need an engineer for a second-storey addition in North York?
Usually. A second storey adds load to the existing walls, beams and foundations, so a structural engineer checks them and designs the new framing. Drawings sealed by an engineer go with the City’s Assumption of Responsibility for Engineering Content form. An architect or BCIN designer typically prepares the architectural drawings.
Does Elmid build or demolish houses?
No. Elmid Design Inc. is an engineering consultant. Elmid prepares the design, the permit drawings and the permit application to the City within an agreed scope, including structural, grading, servicing, HVAC and plumbing drawings. A contractor you hire does the demolition and construction.
How much do North York permit drawings cost?
Costs depend on the property and the scope, such as a new house compared with an interior alteration, and which engineering drawings are needed. Elmid prepares a written proposal after reviewing the survey and design, and offers a free consultation and a free quote.
Sources
- City of Toronto, Contact Toronto Building Customer Experience (district offices), modified November 16, 2026, read November 25, 2026.
- City of Toronto, Requesting an In-Person Appointment for Zoning By-law Information, modified July 1, 2026, read November 25, 2026.
- City of Toronto, When Do I Need a Building Permit?, modified July 21, 2026, read November 25, 2026.
- City of Toronto, Former Municipal Zoning By-laws, modified April 21, 2026, read November 25, 2026.
- City of Toronto, New House guide (required documentation, lot grading for infill housing, party walls), read November 25, 2026.
- City of Toronto, Small Residential Additions guide, modified October 2, 2026, read November 25, 2026.
- City of Toronto, Interior Alterations guide, modified October 16, 2026, read November 25, 2026.
- City of Toronto, Residential Underpinning guide, modified August 18, 2026, read November 25, 2026.
- City of Toronto, Express Building Permits, modified December 19, 2025, read November 25, 2026.
- City of Toronto, Building Permit Application Pre-Check, modified August 31, 2026, read November 25, 2026.
- City of Toronto, When to Apply for a Tree or Ravine Permit, modified January 29, 2026, read November 25, 2026.
- City of Toronto, Committee of Adjustment (district hearing agendas), modified March 23, 2026, read November 25, 2026.
This article is general information, not advice for a specific property. Toronto Building and the other agencies named here decide what each application needs; confirm current requirements with the City before you apply.
Geographic Locations That We Service:
Our Licensed Professional Engineers prepare building permit drawings for homes in North York, residential structural design, stormwater management reports, Engineered Site Grading Plans, lot grading, erosion and drainage plans to obtain building permits in Ontario, including a wide range of municipalities. Each area has its own soils, drainage outlets and requirements, so the design is tailored to each one.
Toronto and Surrounding Areas
In the vibrant heart of Ontario, we service Toronto (City of Toronto) and surrounding areas. Additionally, we cover Oshawa (City of Oshawa), Pickering (City of Pickering), and Clarington (Municipality of Clarington). Furthermore, our expertise extends to Ajax (Town of Ajax), Whitby (Town of Whitby), Brock (Township of Brock), Scugog (Township of Scugog), and Uxbridge (Township of Uxbridge).
Halton Region
Moving to the Halton Region, our services encompass Burlington (City of Burlington) and Halton Hills (Town of Halton Hills). Also included are Milton (Town of Milton) and Oakville (Town of Oakville).
Peel Region
In the Peel Region, we provide services in Brampton (City of Brampton), Mississauga (City of Mississauga), and Caledon (Town of Caledon).
York Region
Our services in the York Region cover Vaughan (City of Vaughan), Aurora (Town of Aurora), and East Gwillimbury (Town of East Gwillimbury). We also cater to Georgina (Town of Georgina), Markham (City of Markham), Newmarket (Town of Newmarket), Richmond Hill (City of Richmond Hill), Whitchurch-Stouffville (Town of Whitchurch-Stouffville), King (Township of King), and Bradford-West Gwillimbury (Town of Bradford-West Gwillimbury). Each municipality here offers a distinct setting, requiring our specialized approach.
Other Southern Ontario Cities and Towns
We also serve many other cities and towns in Southern Ontario. These include Hamilton (City of Hamilton), St. Catharines (City of St. Catharines), Niagara on the Lake (Town of Niagara on the Lake), Brant (County of Brant), Cambridge (City of Cambridge), Kitchener (City of Kitchener), Waterloo (City of Waterloo), and Woodstock (City of Woodstock). Furthermore, we operate in Centre Wellington (Township of Centre Wellington), Shelburne (Town of Shelburne), Orangeville (Town of Orangeville), New Tecumseth (Town of New Tecumseth), Essa (Town of Essa), Collingwood (Town of Collingwood), Wasaga Beach (Town of Wasaga Beach), Barrie (City of Barrie), Midland (Town of Midland), Orillia (City of Orillia), Ramara (Town of Ramara), Minden Hills (Town of Minden Hills), North Kawartha (Town of North Kawartha), Kawartha Lakes (City of Kawartha Lakes), Peterborough (City of Peterborough), Selwyn (Town of Selwyn), and Brighton (Municipality of Brighton).