ELMID DESIGN INC. | ENGINEERING INSIGHTS

Structural Engineer in Whitby: Residential Structural Drawings and Permits

In Whitby, adding or removing walls, cutting new window or door openings, building a basement or main-floor walkout, and additions all need a building permit from the Town, and the Town lists structural drawings among the technical drawings a project may need. A residential structural engineer designs that work; Elmid Design Inc. prepares the design, the permit drawings and the permit application to the Town.

Rear of a two-storey brick house with a new basement walkout: a door opening cut into the foundation under a steel lintel, concrete retaining walls and steps

Free quote for structural drawings in Whitby: describe the house and the change through our contact form, or call (647) 745-4507. We reply by email so you can send photos, a survey and any existing drawings.

This guide is written for Whitby and Brooklin homeowners, small builders and designers. It follows the Town of Whitby’s own permit list and application steps, and explains where a structural engineer fits. Elmid’s structural work is residential only: houses, additions, decks, basements and the openings and foundations that go with them.

The image at the top of this page is illustrative (AI-generated, checked by Elmid). It shows a general example of a basement walkout under construction, not a real project, and no design values.

Looking for grading, servicing or a stormwater brief instead? Our page on civil engineering consulting in Whitby covers the site side. This page is about the house structure.

What does a structural engineer do for a Whitby house?

For a Whitby house, a structural engineer checks how a planned change affects the floors, walls, roof and foundation, designs the new beams, lintels, posts, footings and connections, and prepares the structural drawings that go to the Town of Whitby with the permit application. A contractor you hire then builds to those drawings.

The engineer is not replacing the architect or the designer who draws the house. Most Whitby house projects have architectural drawings from a designer with a Building Code Identification Number (BCIN) or an architect, and the engineer adds the structural design for the parts that fall outside the Building Code’s Part 9 prescriptive tables or that the Town asks to be engineered.

Which Whitby projects does the Town say need a building permit?

The Town of Whitby’s permit page lists additions, finished basements, garages, porches, sunrooms, decks more than 24 inches above grade, structural alterations such as adding windows or doors, adding or removing walls, basement or main-floor walkouts and additional dwelling units among the projects that need a building permit.

That list matches most of the residential structural work we do. Opening a kitchen to the living room means removing a wall. A larger patio door or a new window in a brick wall is a structural alteration. A walkout cuts through the foundation. Each one needs a permit before work starts, and each one usually needs structural drawings.

The Town also notes that re-cladding may need a permit where there is a structural change or a significant material change, such as vinyl siding to brick or stone veneer. Brick veneer adds weight and needs support at the foundation and over openings, which is a structural question.

What kinds of Whitby homes do we see?

Whitby’s housing ranges from older homes in and around downtown Whitby and the historic core of Brooklin, through the two-storey homes, back-splits and bungalows of the later suburbs, to newer subdivisions in north Whitby and Brooklin. The age of the house shapes what the engineer needs to find out first.

Older homes near downtown Whitby and in old Brooklin. Framing and foundations vary, and some properties have heritage status. Before designing a beam or underpinning, the engineer needs to know what the existing members and footings are, which can mean opening a ceiling or exposing a footing.

Suburban two-storey homes and back-splits. These often get open-concept main floors, rear additions and finished basements. Point loads from the second floor and roof usually come down through an interior bearing wall and a basement beam, so changing one floor affects the others.

Newer subdivision homes. Many have engineered floor joists and roof trusses, lots where the grade allows a walkout, and owners who want a basement unit. Engineered products have the manufacturer’s rules for openings and bearing, and the design has to respect them.

What goes in a Whitby permit application for structural work?

The Town of Whitby asks for four mandatory items: the application to construct or demolish, Schedule 1 designer information, architectural drawings and the applicable law checklist. Depending on the project, it may also need structural drawings, engineered floor or roof drawings, a grading plan, HVAC drawings and other approvals.

The additional documents the Town lists include a letter of authorization when someone applies for the owner, a Central Lake Ontario Conservation Authority (CLOCA) permit where the lot is regulated, Region of Durham health approval for septic systems, a Grading, Servicing and Drainage Permit from the Town’s Engineering group, a Commitment to General Review by architects and engineers, and a flow control roof drainage declaration where it applies.

The Town also publishes a document called “Documentation Required when Applying for a Building Permit” for applicants unsure which drawings their project needs, and warns that incomplete submissions may delay the whole approval process. A complete set, with the structural drawings coordinated with the architectural ones, is the most useful thing an applicant can control.

How do you apply for a building permit in Whitby?

Residential alterations and additions under Part 9 can be submitted through the Town of Whitby’s E-Portal or on paper. The application is pre-screened, and once it passes, the Town sends instructions and an invoice by email. Revisions to residential permits can be sent by email or on paper.

Paper submissions go to the Building Services Division at 3050 Garden Street, Unit 102. Before uploading to the E-Portal, the Town asks applicants to read its E-Portal submission standards, which set out how drawings and documents should be prepared as files. Getting this right avoids a returned submission at the pre-screening stage.

Where Elmid prepares the permit application, we assemble the structural drawings with the rest of the set and submit through the Town’s chosen channel on the owner’s behalf, with the owner’s letter of authorization.

What does the Town expect for a basement walkout?

A walkout or below-grade entrance is on the Town of Whitby’s permit list and has its own residential application type. The structural drawings show the new foundation opening, the beam or lintel over it, the support at each side, retaining walls along the stairs and how the foundation is protected during excavation.

Walkouts change the yard as well as the house. The lowered area beside the foundation needs somewhere for water to go, and a Grading, Servicing and Drainage Permit from the Town’s Engineering group may be needed. Our guide to walkout basement drainage and grading covers that part.

Many walkouts are built to give a basement unit its own entrance. In that case the structural design has to fit the fire separation, exit and ceiling-height requirements that come with a second unit.

How is a wall removal or new opening designed in Whitby?

The engineer confirms what the wall or wall section carries, then designs the beam or lintel that replaces it, the posts or jambs at each end, and the footings or bearing below. The drawings call for temporary shoring by the contractor. The Town of Whitby reviews these drawings before the wall is opened.

Engineered wood and steel are both common for new beams; our LVL vs steel beam guide explains how the choice is made. For a new window or a wider patio door in a brick wall, the lintel also has to carry the brick above, and the jambs have to bring that load down to the foundation.

For background on identifying a bearing wall, see our guide to load-bearing wall removal in Ontario.

Do additions, garages and sunrooms in Whitby need structural design?

Usually. An addition needs a foundation and a structural tie to the house; a second-storey addition adds load to walls, beams and footings sized for less; an attached garage or sunroom often has long spans and wide openings. The Town of Whitby lists all of these as permit projects.

Where new roof trusses or engineered floor joists are used, the manufacturer’s engineer designs them and the Town may ask for those engineered floor or roof drawings with the application. Elmid reviews the truss shop drawings against the building design and shows the bearing and connections. Our additions permit drawings guide covers the full set.

What about finished basements, underpinning and additional units?

A finished basement on its own may not need an engineer, but removing a basement post, lowering the floor or adding an additional dwelling unit often does. Underpinning extends the foundation down in planned sections, so it needs an engineered design and a permit from the Town of Whitby before digging starts.

The Town strongly prefers E-Portal applications for additional dwelling units, both in the house and detached. Structural items in a basement unit commonly include a new beam where a post is removed, a new or enlarged window opening for a bedroom, and underpinning for headroom. Our underpinning permit guide explains the drawings.

What should you check before applying in Whitby?

The Town of Whitby asks owners to confirm the project meets the Zoning By-law first. A project that does not comply may need a minor variance from the Committee of Adjustment, and a property under site plan control may need site plan approval. Heritage, conservation and regional approvals can also apply.

The agencies the Town names include CLOCA, Town of Whitby Heritage, the Town’s Engineering group, the Ministry of Transportation, the Region of Durham and the Electrical Safety Authority. For a structural project the common ones are zoning for additions and second storeys, heritage for older homes in designated areas, and CLOCA near valleys and watercourses.

How is structural engineering different from civil engineering in Whitby?

Structural engineering covers the house: beams, walls, openings, foundations, additions and decks. Civil engineering covers the land: grading, drainage, servicing and stormwater, including the Town’s Grading, Servicing and Drainage Permit. A Whitby project can need both, and Elmid prepares each as a separate design.

For infill houses, the Town may also ask for a stormwater management brief, explained in our Whitby stormwater brief guide. For grading, servicing and site drawings, start with our civil engineering consultant in Whitby page.

Who does what on a Whitby structural project?

The owner applies or authorizes an agent. A BCIN designer or architect prepares the architectural drawings. The engineer designs the structure that needs engineering. The contractor builds, shores and keeps the site safe. The Town of Whitby pre-screens and reviews the application, issues the permit and checks the work at set stages.

Where the design needs it, the owner signs the Commitment to General Review, and the engineer reviews the construction of the structural work for general conformity with the design. Elmid provides that review for its own design where the Town requires it. If a different beam or detail is proposed on site, it goes back to the engineer and, where needed, to the Town as a revision to the residential permit.

What should you send for a structural design in Whitby?

Send photos of the area being changed and the basement below it, any existing drawings, a current survey for additions, decks and walkouts, a sketch of the change, the property address, and any Town comments. Note what sits above a wall to be removed, such as a bathroom or a roof ridge.

Costs depend on the site and scope; Elmid prepares a written proposal. The consultation and the quote are free. We prepare the design and drawings from these records; site work by Elmid is limited to the review the Town requires.

Related articles

Frequently asked questions

Do I need a permit to remove a wall in Whitby?

Yes, when the wall is structural. The Town of Whitby lists adding or removing walls and structural alterations among the projects that need a building permit. A load-bearing wall is replaced by a beam with posts and footings, which an engineer designs and the Town reviews before the wall is opened.

Does Whitby need structural drawings for a basement walkout?

Usually. A walkout cuts a new opening in the foundation wall and lowers the yard beside it, so the drawings show the beam or lintel over the opening, the supports, any retaining walls and how the foundation is protected. The Town of Whitby has a residential below-grade entrance application type for this work.

Can I apply for a Whitby building permit online?

Yes. The Town of Whitby accepts residential alterations, additions, decks, finished basements, below-grade entrances and additional dwelling units through its E-Portal, as well as on paper. Applications are pre-screened, and the Town then sends instructions and an invoice by email. Revisions to residential permits can be emailed.

What is the Commitment to General Review in Whitby?

It is a form in which the owner commits to having the architect or engineer review the construction for general conformity with their design, where the Building Code requires it. The Town of Whitby lists it among the documents that may be needed. Elmid provides that review for its own structural design where required.

Does Elmid build the walkout or install the beam?

No. Elmid Design Inc. is an engineering consultant. We prepare the design, the permit drawings and the permit application to the Town of Whitby. A contractor you hire supplies, shores and builds the work, and the Town reviews the permit and checks the work on site at the required stages.

How much does a structural engineer cost in Whitby?

Costs depend on the site and scope: what is being changed, what the existing structure is and what the Town asks for. Elmid prepares a written proposal after reviewing photos and any existing drawings, and the consultation and the quote are free. Construction is priced separately by the contractor who builds it.

Sources

This article is general information for Whitby, Ontario, not design advice for a specific property. Requirements change; confirm the current process with the Town of Whitby Building Services Division before you apply.


Geographic Locations That We Service:

Our Licensed Professional Engineers specializing in residential structural design and building permit drawings prepare wall removal and opening designs, basement walkout, underpinning, addition and deck drawings and engineering letters to obtain building permits in Ontario, including a wide range of municipalities. Each area has its own building department process and requirements, so the drawings are tailored to each one.

Toronto and Surrounding Areas

In the vibrant heart of Ontario, we service Toronto (City of Toronto) and surrounding areas. Additionally, we cover Oshawa (City of Oshawa), Pickering (City of Pickering), and Clarington (Municipality of Clarington). Furthermore, our expertise extends to Ajax (Town of Ajax), Whitby (Town of Whitby), Brock (Township of Brock), Scugog (Township of Scugog), and Uxbridge (Township of Uxbridge). 

Halton Region

Moving to the Halton Region, our services encompass Burlington (City of Burlington) and Halton Hills (Town of Halton Hills). Also included are Milton (Town of Milton) and Oakville (Town of Oakville). 

Peel Region

In the Peel Region, we provide services in Brampton (City of Brampton), Mississauga (City of Mississauga), and Caledon (Town of Caledon). 

York Region

Our services in the York Region cover Vaughan (City of Vaughan), Aurora (Town of Aurora), and East Gwillimbury (Town of East Gwillimbury). We also cater to Georgina (Town of Georgina), Markham (City of Markham), Newmarket (Town of Newmarket), Richmond Hill (City of Richmond Hill), Whitchurch-Stouffville (Town of Whitchurch-Stouffville), King (Township of King), and Bradford-West Gwillimbury (Town of Bradford-West Gwillimbury). Each municipality here offers a distinct setting, requiring our specialized approach.

Other Southern Ontario Cities and Towns

We also serve many other cities and towns in Southern Ontario. These include Hamilton (City of Hamilton), St. Catharines (City of St. Catharines), Niagara on the Lake (Town of Niagara on the Lake), Brant (County of Brant), Cambridge (City of Cambridge), Kitchener (City of Kitchener), Waterloo (City of Waterloo), and Woodstock (City of Woodstock). Furthermore, we operate in Centre Wellington (Township of Centre Wellington), Shelburne (Town of Shelburne), Orangeville (Town of Orangeville), New Tecumseth (Town of New Tecumseth), Essa (Town of Essa), Collingwood (Town of Collingwood), Wasaga Beach (Town of Wasaga Beach), Barrie (City of Barrie), Midland (Town of Midland), Orillia (City of Orillia), Ramara (Town of Ramara), Minden Hills (Town of Minden Hills), North Kawartha (Town of North Kawartha), Kawartha Lakes (City of Kawartha Lakes), Peterborough (City of Peterborough), Selwyn (Town of Selwyn), and Brighton (Municipality of Brighton).

Share This Guide

Related Engineering Guides

Contact Elmid Design Inc.

Let’s discuss
your project.

Engineering design services across Toronto, the GTA and Ontario.

Contact Elmid Design Inc. for engineering and design support. Tell us about your property and proposed work so we can help identify the next steps.

Contact Us graphic with email and phone symbols over an engineering site plan.

Supporting projects in Toronto and other communities across the GTA and Ontario.

A CLEAR FIRST STEP

Contact Our Engineering Team

Share what you have now. You don’t need a complete drawing package to start.

Scroll to Top
Planning a project? Speak with our engineering team. ☎ (647) 745-4507✉ info@elmid.ca Request a Proposal →