Engineered truss drawings are the sealed design sheets a truss manufacturer’s engineer prepares for each roof or floor truss, together with a layout showing where every truss sits. For a Toronto building permit they are one part of the package: they have to agree with the roof plan, the sections and the structure that carries the trusses, which belong to the building permit drawings.

Prepared by Elmid Design Inc. · Reviewed by Hamid Akbari, P.Eng.
The image above is illustrative only. It is not a project drawing and contains no design values.
This guide is for Toronto homeowners, builders and designers planning a new house, an addition, a second storey or a detached garage with a manufactured roof or floor system. It explains what the City asks for, who is responsible for which drawing, and what to settle before trusses are ordered. People also search for these sheets as roof truss drawings or truss shop drawings.
Key takeaways
- In Toronto, the City allows the truss and floor joist shop drawings to be submitted at the construction stage, to the City’s building inspector. Most other Ontario municipalities ask for them at the permit stage.
- Truss drawings cover the trusses. They do not design the walls, beams, lintels, posts and foundations that carry them.
- Drawings that carry a professional engineer’s seal need the City’s Assumption of Responsibility for Engineering Content form.
- Name who designs the trusses, who designs the supporting structure and who checks that the two agree before anything is ordered.
- A truss must not be cut, notched, drilled or moved on site without written direction from the engineer responsible for it.
What are engineered truss drawings?
Engineered truss drawings are design sheets for manufactured roof or floor trusses, prepared and sealed by the engineer working for the truss manufacturer. Each sheet covers one truss type: its shape, span, member sizes, connector plates, design loads and bearing points. A separate layout shows where each truss goes on the building.
A truss is a factory-built frame of lumber joined with metal plates. Because it is designed as a single engineered component, it cannot be judged from a span table the way a simple rafter or joist can. The truss design depends on the loads and geometry the building designer gives the manufacturer.
Three documents are easy to confuse:
| Document | What it is | What it is not |
|---|---|---|
| Supplier quotation or preliminary layout | A price and a first arrangement, often made from early sketches | A design for construction or for a permit |
| Truss layout (placement plan) | A plan showing each truss by its mark, its spacing and direction | A design of the walls and beams below |
| Sealed truss design sheets | The engineered design of each truss type, sealed by the truss engineer | A design of the whole roof structure or the building |
Use the document title, date and revision when you send files to anyone. “The truss plans” can mean any of the three.
When are truss drawings needed: at the permit stage or during construction?
It depends on the municipality. In Toronto, the City allows the truss and floor joist shop drawings to be submitted at the construction stage, to the City’s building inspector, rather than with the permit application. Most other Ontario municipalities ask for them at the permit stage, with the roof plan. The City’s New House application guide lists “Truss Drawings and Floor Joist Plan” under the roof plan “where engineered roof trusses or floor systems are proposed”, so confirm with Toronto Building, or your own municipality, when they are due for your project. Either way, the roof plan in the permit drawings must show the roof structure, slopes, hips, valleys, peaks, skylights and ventilation.
The same guide states that applications including drawings with the seal of a professional engineer must include a completed Assumption of Responsibility for Engineering Content form, and that all drawings, reports and forms are submitted as PDF files. Source: City of Toronto, New House guide (page dated August 27, 2026; accessed 2026-11-13).
That guide is written for a new house. An addition, a second storey, a roof alteration or a garage can have a different checklist, so confirm the documents for your project with Toronto Building. For the wider process, see our Toronto building permit guide and the list of Toronto permit documents by type of work.
Who prepares and seals engineered truss drawings?
The truss manufacturer’s engineer prepares and seals the truss design sheets. The engineer or designer responsible for the building prepares the roof plan and designs the structure that supports the trusses. Each one takes responsibility for their own work, so the two sets must be checked against each other.
Professional Engineers Ontario describes this split in its guideline Structural Engineering Design Services for Buildings (2017; accessed 2026-11-13). It calls the engineer responsible for the building’s main structure the primary structural engineer, and the engineers who design fabricated components, such as wood trusses, specialty structural engineers. The specialty engineer signs and seals the component design. The primary engineer reviews it for general conformance with the building design.
The guideline is professional practice guidance. It does not replace the Ontario Building Code or the contract for a particular project.
| Party | Role with engineered trusses |
|---|---|
| Building designer (BCIN designer, architect or engineer) | Roof plan, sections and the architectural drawings the trusses must fit |
| Structural engineer for the building | Beams, lintels, posts, bearing walls and foundations that carry the trusses; review of the truss package against the building design, where engaged |
| Truss manufacturer and its engineer | Truss layout, sealed design of each truss, and the manufacturer’s bracing and handling information |
| Contractor or framer | Ordering, delivery, storage, lifting, installation and temporary bracing |
| Toronto Building | Reviews the application, issues the permit and inspects |
| Owner | Hires the team, approves changes and keeps the current set of drawings |
On a small house project one person may hold two of these roles. That should be a written arrangement, not an assumption.
What do engineered truss drawings show?
A truss design sheet shows the truss profile and span, the size and grade of each member, the connector plates at each joint, the loads the truss was designed for, the reactions at each bearing point, the spacing, and any permanent bracing the design relies on. It also carries the engineer’s seal and date.

- Truss mark, which must match the mark on the layout
- Span, pitch, heel height and overhang
- Lumber size and grade for chords and webs
- Connector plate sizes and positions
- Design loads and the code edition used
- Reactions and required bearing length at each support
- Girder trusses, hangers and multi-ply fastening where used
- Permanent web or chord bracing called for by the design
The reactions matter most to the building design. They are the forces the walls, beams and foundations below have to carry, and they are often concentrated under girder trusses.
How do truss drawings fit with the roof layout and the structure below?
The roof plan sets the shape, the truss layout places each truss on that shape, and the building’s structural drawings carry the truss reactions down to the foundation. If the roof plan changes after the truss package is issued, the layout, the truss designs and the supports all need to be checked again.
Common places where the documents disagree:
- A girder truss lands on a wall or beam that was sized before the truss reactions were known.
- A bearing wall on the truss layout is shown as a non-bearing partition on the floor plan.
- Heel heights or overhangs differ from the building sections, which changes the roof height shown on the elevations.
- A vaulted or tray ceiling, attic storage or mechanical equipment was added after the trusses were designed.
- A skylight, chimney or roof hatch falls on a truss line.
A roof that changes height or slope can also affect zoning measurements. If the project involves the roof space itself, see our guide to an attic conversion permit in Toronto.
What information does the truss designer need?
The truss designer needs the current architectural drawings: floor plans, roof plan, sections and elevations with dimensions, bearing wall locations, ceiling shapes, roof slopes and overhangs. The designer also needs the design loads, any equipment or storage carried by the trusses, and the locations of openings such as skylights and attic hatches.
- A dated, numbered drawing set, not a cropped image of the roof
- Which walls and beams are available as supports
- Roofing and ceiling materials, where they affect the loads
- Solar panels, rooftop units or attic equipment, if planned
- For an addition: how the new roof meets the existing roof and what is known about the existing framing
A roof truss design is only as reliable as the information it starts from. In an existing house the old drawings may not match what was built. The team should decide what needs to be measured or opened up, and who does it. If a supplier prices from early sketches, label that package as preliminary so it does not become the manufacturing set by default.
When should the structural engineer review the truss package?
Before the trusses are ordered and before the permit drawings are finalized. At that point the engineer for the building can compare truss reactions with the beams, lintels, walls and foundations, check that marks and bearing points match the plans, and return questions to the truss designer while changes are still simple.
What the review covers should be written into the engineer’s scope. A review for general conformance with the building design is not a re-design of the trusses, and it does not move responsibility for the truss design away from the engineer who sealed it.
A short register keeps open questions visible. For each item record the question, who answers it, which drawing or letter holds the answer, and whether it is closed. Owners can keep this list without doing any engineering.
What happens if the roof design changes after the trusses are designed?
Stop and send the change to both designers. The truss engineer revises or confirms the affected trusses, the engineer for the building checks the supports, and the revised sheets replace the old ones in the permit set. If the permit is already issued, ask Toronto Building how the revision must be submitted.
Changes that look minor can affect the trusses: a wider opening below a girder, a moved bearing wall, a new skylight, a heavier roofing material or a different ceiling shape. Record whether a revised package replaces every earlier sheet or only the trusses named in it. Our guide to building permit revisions in Toronto covers the municipal side.
Can a truss be cut, drilled or altered on site?
No, not without written direction from the engineer responsible for that truss. Each member and plate is part of the engineered design, so cutting a web for a duct, notching a chord or moving a bearing point changes how the truss carries load. Any repair or alteration needs a written detail from that engineer.
Plumbing, HVAC and electrical routes should be planned around the trusses during design. Where a duct, stack or attic hatch has to pass through a truss line, the truss designer can often frame around it if asked before manufacture. If a truss is damaged in delivery or installation, the contractor should report it to the manufacturer and wait for a repair detail.
What does Elmid Design Inc. do, and what stays with the supplier, the contractor and the City?
Elmid Design Inc. is an engineering consultant. We prepare building permit drawings and structural design for houses, additions and accessory buildings, and we review the truss shop drawings and the girder truss locations against the building design within the agreed scope. We do not design, manufacture, supply or install trusses, and we do not issue permits.
Truss design and fabrication stay with the manufacturer and its engineer. Ordering, lifting, installation, temporary bracing and site safety stay with the contractor. Review of the application, the permit and inspections stay with the City of Toronto.
Elmid Design Inc. holds a Certificate of Authorization from Professional Engineers Ontario, which can be checked in the PEO directory. That credential is not a municipal approval or a guarantee of a project outcome. Costs depend on the site and the scope; request a proposal. See all engineering services or contact us for a free quote with your drawings and a short description of the work.
Frequently asked questions
Do I need truss drawings before I apply for a Toronto permit?
Usually not. In Toronto, the City allows the truss and floor joist shop drawings to be submitted at the construction stage, to the City’s building inspector. The trusses must still fit the roof plan and structure in the permit drawings, so settle the layout early. Most other Ontario municipalities ask for the shop drawings at the permit stage. Confirm with Toronto Building for your project.
Is a roof truss layout the same as engineered truss drawings?
No. A roof truss layout is a plan showing where each truss sits, its mark, spacing and direction. Engineered truss drawings are the sealed design sheets for each truss type. A complete package has both, and the truss marks on the layout must match the marks on the design sheets.
Who is the truss engineer on a house project?
Usually an engineer employed or retained by the truss manufacturer. That engineer seals the truss design sheets. The engineer or designer of the building is a different party unless your team has arranged otherwise in writing. Ask the supplier for the sealing engineer’s name when you request the package.
Does a detached garage or accessory building need engineered truss drawings?
If the garage or accessory building needs a building permit and uses manufactured roof trusses, expect the municipality to ask for the truss drawings: in Toronto usually at the construction stage, and in most other municipalities with the permit application. Whether a permit is needed depends on the size and use of the building, so confirm with the municipality before ordering anything.
Can a structural engineer do the truss design instead of the manufacturer?
Manufactured plated trusses are normally designed by the manufacturer’s engineer, because the design is tied to that plant’s plates, lumber and software. A consulting structural engineer designs site-built roof framing, beams and the supporting structure, and can review the manufacturer’s package against the building design.
Does a sealed truss drawing mean the roof is approved?
No. A seal shows that an engineer takes responsibility for the content of that sheet. It does not cover the rest of the building, and it is not municipal approval. Toronto Building reviews the whole application, and a permit is issued only when the City is satisfied with it.
Related articles
- Structural engineer in Toronto: services, permits and when you need one
- Home addition permit in Toronto
- Garage permit in Toronto
- Accessory structure permits in Ontario
- Load-bearing wall removal in Ontario
- Building permit drawing service
Sources
- City of Toronto, New House building permit application guide: required documentation (roof plan, truss drawings and floor joist plan) and the Assumption of Responsibility for Engineering Content form. Page dated August 27, 2026. Accessed 2026-11-13.
- Professional Engineers Ontario, Structural Engineering Design Services for Buildings, practice guideline, 2017: primary and specialty structural engineers. Accessed 2026-11-13.
- Professional Engineers Ontario, Directory of practitioners and Certificate of Authorization holders. Accessed 2026-11-13.
This article is general information. It is not a design for a particular building, a truss specification or an approval. Requirements change; confirm the current submission requirements with Toronto Building before design or construction.