Erosion & Sediment Control Plans
An erosion and sediment control plan coordinates measures for disturbed soil and construction runoff. Elmid Design Inc. prepares site-specific ESC drawings for residential and non-residential projects, based on the property, drainage conditions and agreed engineering scope.
PEO Certificate of Authorization · Toronto & GTA
Elmid Design Inc.: erosion and sediment control engineering
Elmid Design Inc. is an Ontario professional engineering and design consulting firm based in Richmond Hill. We prepare erosion and sediment control plans for residential, commercial, institutional and land-development projects across Toronto, the GTA and other Ontario communities.
Our engineering work connects the proposed soil disturbance with the site’s grading, drainage and construction sequence. We review the available drawings and authority comments, define a project-specific scope, and coordinate the agreed ESC design with other civil engineering documents.
Elmid Design Inc. provides drawings, technical advice and review support. Supply, installation and maintenance of site controls remain with the responsible construction team. Learn about Elmid Design Inc.
Erosion and sediment control design for your project
Residential projects
ESC planning for new homes, additions and infill work. Coordinate the proposed disturbance, access and grading information with the applicable submission requirements.
Non-residential projects
Engineering drawings for commercial, industrial and institutional sites. Review work areas and site logistics alongside the wider design package.
Site alteration and grading
Controls coordinated with the proposed land disturbance and related civil drawings. Confirm the permit and supporting-document requirements for the property.
Review and revision support
Defined support for municipal comments and design changes within the agreed assignment. Keep drawing issues and site information coordinated.
Site-specific erosion and sediment control planning
An erosion and sediment control plan identifies measures for managing disturbed soil and construction runoff. It shows how the proposed work relates to drainage routes, nearby infrastructure and the areas that need protection. Elmid Design Inc. prepares these drawings for residential, non-residential and land-development assignments in Toronto and the GTA.
The design starts with the actual property and proposed activities. A small infill lot with limited access needs a different approach from a larger development with several construction stages. We review the available survey, grading information, site layout and municipal comments before defining the drawing scope.
Elmid Design Inc. holds a Certificate of Authorization from Professional Engineers Ontario (PEO). Our role is professional engineering and design consulting. We do not supply or install silt fences, carry out excavation, provide landscaping or act as the construction contractor.
A drawing must also be usable by the people carrying out the work. We aim to make the control locations, relevant details and design notes clear. The owner and contractor must understand their responsibilities under the project documents and approvals. An ESC drawing does not remove the need for site implementation, maintenance or any required permits.
When might you need an ESC plan?
A reviewing authority may request an erosion and sediment control plan when work disturbs the ground, changes grading or affects drainage. Examples include new buildings, additions, excavation, servicing works and site alterations. The appropriate submission depends on the location, proposal and reviewing authority.
Ask who requested the plan and why. It may form part of a municipal engineering submission, a site alteration application or a wider development package. Send the checklist or comment letter with your enquiry. This helps establish whether the authority expects a separate drawing, a coordinated grading sheet or additional supporting information.
However, local requirements differ across the GTA. Richmond Hill publishes guidance for site grading, servicing and ESC plans. Markham’s engineering submission outlines include an ESC report scope for relevant development applications. Richmond Hill drawing guidance · Markham engineering submission resources.
If work has already started, tell us what has changed and provide current site photographs and the approved drawings. A new design assignment may need additional information about the current conditions. Do not assume that a drawing prepared for the original layout remains suitable after the work area or construction access changes.
What your ESC plan can include
The erosion and sediment control plan may identify the property boundary, limits of disturbance, existing drainage and proposed construction areas. Depending on the assignment, it can show access locations, control measures, stockpile areas and relevant site details. The drawing should relate these items to a clear base plan.
Supporting notes may address the intended sequence, inspection and maintenance responsibilities, repair needs and removal or restoration requirements. Some applications also need a report or calculations. We confirm the requested deliverables rather than assuming that one standard sheet will satisfy every review.
Markham’s published submission outline includes construction sequencing, stockpile information, monitoring, maintenance, contingency planning and record keeping. These topics illustrate why ESC can involve more than placing a fence symbol around a property. However, confirm the project-specific scope with the reviewing authority.
At proposal stage, we identify the included documents, required background drawings and any agreed construction-stage review. The owner should also know who will receive the final documents and who will respond if site conditions differ from the design information.
Erosion control and sediment control work together
Erosion control addresses the risk of soil detachment and movement. In contrast, sediment control addresses material that erosion has already mobilized. A coordinated approach considers the disturbed area and the routes by which runoff can carry material toward roads, drainage infrastructure or sensitive features.
The plan should explain the location of each selected measure. Drawing a line around the property is not a substitute for understanding drainage and construction access. The available grading information and sequence of work help frame the design discussion.
For a property owner, useful questions are: Which areas will the work disturb? Where can runoff leave the work area? What needs protection nearby? How will construction vehicles enter? Who will inspect the measures and arrange repairs? These questions help organize the assignment without prescribing a generic design.
The actual choice, layout and detailing of measures should be left to the site-specific design. A list on a website cannot establish the correct spacing, capacity or installation method for your property. Therefore, we avoid standard numerical promises without a review of the relevant criteria and site conditions.
ESC plan controls and site coordination
Common measures can include sediment barriers, inlet protection, stabilized access and controls for stockpiled soil. The appropriate combination depends on the proposal and the accepted design. Toronto’s construction guidance identifies several runoff-control measures and emphasizes regular inspection and maintenance. Toronto construction wastewater and debris guidance.
The design discussion should also consider how the contractor will reach the work area without repeatedly disturbing a control location. Also coordinate access, storage and working space with the proposed plan. Tell us about known constraints early, including narrow driveways or a need to maintain access to an occupied building.
If the project team proposes a stockpile location, identify it on the current layout rather than leaving it as an undocumented site decision. If the intended location changes, the project team should review the drawing and applicable requirements. A change in construction logistics can make part of an earlier plan difficult to implement.
We can describe design intent and prepare the agreed details, but the contractor remains responsible for carrying out the work assigned to it. Therefore, refer questions about substitutions or revised arrangements through the project’s review process. A measure that looks similar is not automatically an acceptable substitute.
ESC plans for residential infill sites
Residential projects can have little space between the excavation, driveway, property limits and neighbouring features. An ESC assignment should begin with a clear description of the work area and construction access. Also coordinate the plan with the proposed house or addition and available grading information.
Send the current architectural site plan and identify any parts of the property that must remain accessible. Tell us whether the house will remain occupied, whether the driveway will change and whether there are existing site approvals. These are useful planning inputs for the assignment; they are not a substitute for detailed construction planning by the contractor.
For a small project, the reviewer may accept ESC information alongside a site grading plan. Other projects need a separate drawing. We confirm the expected presentation and the responsibilities for related information before preparing the package.
For a closer look at small-lot work, read our guide to residential infill ESC plans in Ontario. If a homeowner has received a municipal comment, the best starting point is the complete letter and the drawings that were reviewed. We can then assess the requested engineering work. We do not recommend copying the control layout from a neighbouring project because its work area, drainage and approval conditions may differ.
Subdivision ESC plans
Subdivision erosion and sediment control planning considers how exposed ground, drainage and access change across stages of land development. The drawing scope may need to identify clearing limits, temporary drainage routes, stockpile areas, site entrances and the order in which controls are placed. The project team should confirm the municipality’s and any conservation authority’s requirements for the specific application.
Elmid Design Inc. coordinates ESC information with the current subdivision layout and related grading, servicing and stormwater management drawings within its agreed engineering scope. Changes to road grades, drainage outlets or construction phases should be checked against the ESC plan before a revised set is issued.
Elmid Design Inc.’s Clinton Drive Extension subdivision project in Richmond Hill demonstrates related subdivision design experience. The published project portfolio lists functional servicing, stormwater management, water supply analysis, grading and servicing, plan-and-profile, and sanitary and storm drainage work. For each new subdivision, we assess the ESC deliverable separately against its own site conditions and submission requirements.
The contractor is responsible for putting approved measures in place and maintaining them through construction. Elmid Design Inc. provides professional engineering and design consulting; it does not install controls or perform construction.
ESC plans for non-residential development
Commercial, industrial and institutional projects may involve several work areas and a changing site layout. A useful design discussion identifies the stages that affect the engineering assignment. The owner should explain whether operations will continue and which access routes must remain available.
Larger projects may need coordination between the ESC drawing, grading, servicing and construction-stage information. The exact package should follow the applicable submission requirements. A final site plan alone may not describe every temporary arrangement that matters during the work.
We recommend identifying the current construction-stage assumptions in the design brief. For example, clarify whether the contractor will work in different areas together or separately and whether the intended access point changes. If those assumptions remain unresolved, keep them visible as open items rather than silently treating them as final.
After the contractor is appointed, compare its proposed staging information with the design documents. If the arrangements differ, ask the appropriate consultant to review the effect before relying on the original plan. Then agree on the scope of that review and any required resubmission with the project team.
TRCA ESC plans
If proposed work is in a Toronto and Region Conservation Authority (TRCA) regulated area, a separate TRCA permit or review may be needed. TRCA lists erosion and sediment control plans among potential technical submission requirements, while the plans, reports and level of detail depend on the property and proposal. An ESC drawing by itself does not provide permit approval.
Before developing the drawing package, check the property and proposed work with a TRCA planner. Share the current survey, site layout, work limits and available grading and drainage information. TRCA’s permit application guidance recommends pre-submission discussion to establish which plans and studies are needed.
Where an ESC plan is requested, Elmid Design Inc. can define an engineering scope that coordinates temporary controls with the relevant grading, drainage and site access drawings. Requirements for inspections, construction practices and any other approvals should be confirmed from the actual permit and project documents.
PEO Certificate of Authorization
Elmid Design Inc. holds a Certificate of Authorization from Professional Engineers Ontario (PEO).
The Certificate of Authorization allows a firm to offer professional engineering services to the public. It is separate from an individual engineer’s licence and does not replace project-specific permits or approvals.
Read PEO’s Certificate of Authorization guidance and consult the official PEO directory.
Construction wastewater and your ESC plan
An ESC plan and permission to discharge construction wastewater are different matters. In Toronto, construction wastewater cannot be discharged to the sewer system without the City’s approval. Its guidance describes a discharge permit or agreement route and an alternative involving a licensed waste hauler. Read Toronto’s construction wastewater requirements.
Tell the project team if water is expected to collect in an excavation or if a dewatering arrangement has been proposed. Do not assume that showing a discharge arrow on an ESC drawing authorizes the discharge. The receiving system, approval requirements and relevant specialist input need to be reviewed separately.
At proposal stage, we distinguish the ESC design from any separate dewatering, groundwater or wastewater assignment. If another consultant is responsible for that work, provide their current information for coordination. This helps avoid a gap between the drawings and the permissions needed for the intended arrangement.
Do not use a generic website detail to decide where construction water can be discharged. Follow the authority’s requirements and the approved project documents. If the planned arrangement changes, seek direction through the responsible project team before using a different outlet.
Coordinate your ESC plan with grading and servicing
The ESC drawing should use the same current site base as the related engineering plans. Elmid Design Inc. coordinates the information within its scope and identifies where another consultant’s input is needed. The aim is to avoid a set of individually prepared drawings that describe different proposals.
A practical coordination review checks whether the building footprint, access location and work limits match. It also checks whether the grading and servicing designers have received changes to the site layout. Where the construction sequence matters, the team should know which assumptions support the drawing.
Related assignments can include site servicing drawings, a stormwater management report and site plan drawings. Each has its own purpose. Therefore, do not treat an ESC plan as a replacement for permanent drainage or servicing design.
When a layout changes after submission, circulate the revised base drawing with a short change summary. Ask each consultant to confirm which documents need updating. This creates a clearer record than issuing a new drawing without explaining the change to the rest of the team.
ESC plan installation, inspection and maintenance responsibilities
A plan is useful only when the responsible site team implements and maintains the specified measures. The construction team needs to know which documents apply, who is responsible for the work and how to report concerns. Those responsibilities should be clear in the project arrangements and approval conditions.
Toronto’s guidance expressly calls for regular inspection and maintenance of erosion and sediment controls. Other jurisdictions and project approvals can set their own requirements. Therefore, confirm the applicable frequency and reporting format for the project rather than copying them from an unrelated job.
Ask who will maintain the inspection record, who will organize repairs and who will communicate a problem to the owner or consultant. An effective handover makes these responsibilities visible before the work begins. It should also identify the current drawing issue so the site team is not working from an obsolete copy.
Elmid Design Inc.’s design fee does not automatically include ongoing construction monitoring or certification. If you need those services, expressly agree on their scope before relying on them. We can review the requested role and information needs, but we do not claim to provide continuous site supervision merely by preparing the drawing.
When should your ESC plan go back to the designer?
Tell the project team when the work area, access, stockpile location or sequence changes from the information used in the design. Also report discrepancies between the drawing and the actual property. The response may involve clarification, additional information or a design revision, depending on the issue.
Provide a clear description, photographs where useful and a marked-up current drawing. Identify the affected location rather than relying only on a general message that “the plan does not work.” This makes it easier for the responsible consultant to understand the question and assess the next step.
Keep proposed changes separate from completed changes. If the site team has already altered the work, say so plainly and identify the current condition. The engineering review needs accurate information rather than an assumption that the original arrangement is still in place.
Do not remove or relocate an approved control merely because it interferes with a preferred construction route. Refer the conflict through the project’s review process. The contractor, owner, designer and reviewing authority may have different responsibilities that need to be resolved before the plan can be changed.
Our ESC plan process
Review the request. We examine the address, proposed work, survey, drawings and municipal direction. This review establishes the purpose of the ESC submission and whether the requested assignment includes a drawing alone or related engineering services.
Confirm the inputs. We establish which grading, site-layout and construction information is available. We also record missing items and assumptions. Where another consultant is responsible for an input, we identify that dependency so the owner can coordinate the team.
Prepare the design package. We then develop the agreed erosion and sediment control plan and coordinate it with the relevant site documents. The package identifies the proposed measures and supporting details appropriate to the assignment. Items needing further confirmation remain clearly identified.
Support the review. Where included, we review municipal comments concerning our scope and prepare the agreed responses. The complete comment letter and reviewed drawing issue help keep this process accurate. Changes from other consultants may require coordination before a revised issue is ready.
Clarify the handover. We identify the purpose and status of the issued documents. If you need construction-stage services, agree on their scope and responsibilities separately. Municipal acceptance and permission to begin work remain matters for the relevant authorities and approvals.
Not sure which service you need?
Elmid Design Inc. provides engineering consulting and design for building and land development projects. Send your site information and review comments so we can help identify the engineering support your project needs.
An ESC plan may need coordination with a site grading plan, site servicing drawings or a stormwater management report. The agreed proposal defines the required documents and responsibilities.
Information to send for your ESC plan
Start with the municipal address and a plain-language description of the proposed work. Include the property survey, current site plan, architectural drawings and any available grading or servicing information. If you have several drawing versions, identify the latest one.
Send the municipal application checklist or comment letter in full. Include the application number and relevant attachments. Tell us whether the project is at concept stage, under review or already preparing for construction. If work has begun, describe the current stage and any changes to the original plan.
Useful construction information can include the proposed access, work limits and intended staging. If the contractor has not been appointed or the staging is undecided, say so. We can identify the questions that need answers for the drawing rather than fill gaps with unconfirmed assumptions.
You can still enquire if some information is missing. We will review the available material and explain what is needed to define the assignment. Contact Elmid Design Inc. about your ESC plan.
ESC plan fees and schedules
The engineering fee depends on the available information, required deliverables, site complexity and review support. An ESC addition to a coordinated grading assignment is different from a standalone package prepared from incomplete background information. We define the scope before proposing the fee.
Ask whether the proposal includes meetings, responses to comments, additional drawing issues and construction-stage services. Also clarify how the project team will handle changes to the proposed development. A well-defined proposal makes it easier to distinguish the initial assignment from later work requested by the owner or reviewing authority.
The schedule should identify the inputs needed before design can proceed. Survey information, a stable site layout or an application checklist may be important dependencies. Tell us about your target date and the reason for it, so we can discuss the immediate information needs.
However, we do not promise a fixed municipal approval date or guarantee that the authority will issue no further comments. A completed drawing supports the application, but the authority determines whether its requirements have been met. Clear information and coordinated responses help the project team manage the process realistically.
Define the ESC plan work area before selecting a drawing scope
Define the disturbance area for your erosion and sediment control plan. Identify whether the assignment concerns a whole property, a building addition, a servicing corridor or a particular construction stage. If the limits are not settled, explain which parts of the layout are still being developed. The drawing scope should reflect that uncertainty.
The owner can prepare a short brief with the current site plan, proposed activities and known constraints. Ask the contractor or construction manager to identify the access and working arrangements it expects to use. Where that information is not yet available, record it as an input that will need coordination later.
This discussion is different from asking for a generic fence detail. The project team needs to understand the relationship between the work, the site layout and the applicable submission. The designer can then identify the available information and what needs confirmation before issuing the package.
Keep the brief current as decisions change. A plan prepared around one access point may need review if the contractor proposes another. Clear communication of these changes is more reliable than assuming every consultant will notice a different arrangement in a newly circulated drawing.
Set up a clear ESC plan handover
Before work starts, the owner and contractor should know which ESC drawing issue applies. Provide the relevant approval correspondence and clarify who is responsible for implementation, inspection and reporting under the project arrangements. If the scope includes a consultant’s construction-stage involvement, identify that role explicitly.
A useful handover discussion covers the drawing references, the current staging assumptions and the route for raising a design question. It should also identify who can make owner decisions and who needs updates when an arrangement changes. These are coordination steps, not a substitute for the contractor’s construction planning.
Do not leave monitoring responsibilities implied. Ask whether the approval requires particular records or reporting and who will produce them. Clarify the agreed communication route for observed damage, an ineffective measure or a condition that differs from the drawing. The appropriate response will depend on the actual situation and project requirements.
Keep the contact and document information accessible to the people carrying out the work. A well-prepared drawing is less useful if the site team has an obsolete copy or cannot identify the responsible consultant. If the owner needs support, we can include this handover in the agreed design scope.
Keep an organized record of ESC plan comments and revisions
Track municipal comments against the drawing version the municipality reviewed. Send the complete letter and attachments to the responsible consultant. If a comment relates to another discipline, identify the party who will prepare that response rather than treating every item as an ESC design issue.
For each engineering response, record the action taken and the drawing reference where the revision appears. If more information is needed, identify who will supply it. However, do not mark a comment resolved merely because the consultant issued a revised file; the reviewer may still need to assess the response.
When the site plan changes, keep a short description of the change with the revised drawing. Explain whether it affects the work limits, access, grading or construction sequence. That information helps the engineering team assess the effect on the ESC package without having to infer the owner’s intent.
Retain prior issued packages as background, but clearly distinguish them from the current issue used by the project team. The purpose is a traceable record, not a collection of similarly named files. Clear document control supports review and makes later questions about the design easier to answer.
Prepare for restoration and the end of the assignment
The project should have a clear understanding of the requirements for restoration, removal of temporary measures and any closeout information. Follow the approved documents and applicable conditions. However, the end of one construction activity does not by itself permit the removal of every control.
Ask the responsible project team what information it needs before changing the temporary arrangements. If a consultant’s review or a municipal inspection is required, identify that step in the programme. If it is outside the original engineering assignment, clarify the scope before assuming the service is included.
Keep the final relevant records with the project documents. These may include the current drawings, correspondence and any inspection or maintenance information required by the approval. The specific closeout package depends on the assignment and reviewing authority.
Elmid Design Inc. can discuss the requested engineering role and define any additional service you need. We do not treat a design drawing as certification of work without the required review. Clear scope and accurate records help the owner understand what has been completed and what still requires attention.
Erosion and sediment control project examples
These examples from Elmid Design Inc.’s public project portfolio show the engineering and design services listed for each property.
Functional servicing and stormwater management reports, grading and servicing plans, and erosion and sediment control.
Functional servicing and stormwater management reports, grading and servicing plans, sanitary and storm drainage plans, plan and profile drawings, and erosion and sediment control.
Stormwater management, functional servicing and water supply analysis reports, grading and servicing plans, sanitary and storm drainage plans, plan and profile drawings, and erosion and sediment control.
Frequently asked questions
What does ESC stand for?
ESC means erosion and sediment control. An ESC plan identifies site-specific measures for disturbed soil and construction runoff, with the supporting information needed for the assignment.
Do you install the controls?
No. Elmid Design Inc. provides engineering design and consulting. Installation, maintenance, excavation and construction contracting are outside our services.
Can ESC information be included on a grading plan?
Some projects can use a combined drawing, while others require separate information. Confirm the reviewing authority’s submission requirements before choosing the drawing format.
Does a small residential project need a plan?
It depends on the work, location and application requirements. Send the municipality’s request or checklist so we can review the proposed engineering scope.
Does the ESC plan authorize dewatering?
No. Discharging construction wastewater can require separate permission and technical input. Check the receiving authority’s requirements and the approved project documents.
Who inspects and maintains the measures?
The project arrangements and approvals should identify the responsible parties. Preparing a design does not automatically include ongoing monitoring by Elmid Design Inc. Any construction-stage service must be expressly agreed.
Can I reuse a plan from another property?
A different property can have different drainage, access, work limits and review requirements. A prior plan may illustrate a format, but it should not be used as the design for an unrelated site.
Can you respond to municipal comments?
We can provide review support within the agreed assignment. Send the complete comment letter and the drawings that were reviewed so the required work can be assessed.
When can temporary controls be removed?
Follow the approved design, permit conditions and direction of the responsible project team. Do not rely on a general date or remove measures simply because one stage of work has ended.
What should I send first?
The address, proposed work, survey, current site and grading drawings, and any municipal correspondence are useful starting information. Explain the project stage and identify information that is still being developed.
Municipalities we serve
Elmid Design Inc. prepares site-specific ESC drawings for residential, non-residential and land-development projects in Toronto, the GTA and other Ontario communities. The service-area list below follows our grading service area. Actual requirements depend on the municipality, property and proposal; ask the reviewing authority which drawings and approvals apply.
See Municipalities
Toronto and Durham area
Toronto, Oshawa, Pickering, Clarington, Ajax, Whitby, Brock, Scugog and Uxbridge.
Halton Region
Burlington, Halton Hills, Milton and Oakville.
Peel Region
Brampton, Mississauga and Caledon.
York Region
Vaughan, Aurora, East Gwillimbury, Georgina, Markham, Newmarket, Richmond Hill, Whitchurch-Stouffville and King.
Other Southern Ontario communities
Bradford West Gwillimbury, Hamilton, St. Catharines, Niagara-on-the-Lake, Brant, Cambridge, Kitchener, Waterloo, Woodstock, Guelph, Centre Wellington, Shelburne, Orangeville, New Tecumseth, Essa, Collingwood, Wasaga Beach, Barrie, Midland, Orillia, Ramara, Minden Hills, North Kawartha, Kawartha Lakes, Peterborough, Selwyn and Brighton.
Selected municipal submission guidance
Toronto
Toronto’s construction guidance addresses debris, runoff controls, inspection and construction wastewater. Separate discharge approval may be needed; an ESC drawing does not provide that permission. Toronto construction wastewater and debris guidance.
Richmond Hill
Richmond Hill publishes a combined guideline for site servicing, grading and erosion/sediment control plans in its site alteration resources. Confirm the current drawing scope and permit requirements for the proposal. Richmond Hill servicing, grading and ESC guidelines.
Markham
Markham’s engineering resources include an ESC report submission outline covering relevant drawings, sequencing and monitoring information. Confirm which requirements apply to the development application. Markham guidelines and terms of reference.
Conservation authority guidance
Conservation authorities are watershed regulators, separate from municipalities. For a site in or near a regulated area, confirm which authority has jurisdiction and whether a permit, clearance or ESC information is needed. Requirements are site-specific; the links below are starting points, not a statement that every project requires a permit.
See Conservation Authorities
Toronto and Region Conservation Authority (TRCA)
TRCA reviews development in its regulated areas and determines the plans and studies needed for each permit application. TRCA permit applications.
Lake Simcoe Region Conservation Authority (LSRCA)
LSRCA explains when work near a lake, stream, steep slope or wetland may need permission. LSRCA permit guidance.
Nottawasaga Valley Conservation Authority (NVCA)
NVCA provides a property lookup and recommends an inquiry if part of a property is regulated. NVCA property and permit guidance.
Credit Valley Conservation (CVC)
CVC provides property information and pre-submission consultation for projects in its jurisdiction. CVC property and planning guidance.
Conservation Halton
For its permitting process and application information, see Conservation Halton. Conservation Halton permitting.
Central Lake Ontario Conservation Authority (CLOCA)
CLOCA advises applicants to confirm obligations and check its regulated-area map before undertaking development. CLOCA inquiries and permits.
Unsure which authority covers the property? Use Conservation Ontario’s authority finder, then confirm the site and proposed work directly with that authority.
Discuss your project with Elmid Design Inc.
Send the address, proposed work, available survey and municipal comments. We can review the information and define a practical engineering scope.
Geographic Locations That We Service:
Elmid Design Inc. provides professional erosion and sediment control engineering for projects across the Ontario service areas below. We coordinate ESC drawings with the proposed grading, drainage and site activities, based on the property and applicable review requirements.
These are service areas, not additional office locations. Confirm the municipality and conservation authority for the property before defining the engineering assignment.
Toronto and Surrounding Areas
We provide engineering services in Toronto and provide grading engineering resources through our Toronto grading plan page.
Our service area also includes Oshawa, Pickering with our Pickering grading plan resources, and Clarington.
We also provide engineering services in Ajax through our Ajax grading plan resources, Whitby, Brock, Scugog, and Uxbridge, including our Uxbridge grading plan resources.
Halton Region
Within Halton Region, we provide engineering services in Burlington, including projects requiring Burlington grading plans.
We also provide engineering services in Halton Hills, supported by our Halton Hills grading plan resources.
Our service area also includes Milton and Oakville, including our Oakville grading plan resources.
Peel Region
Within Peel Region, we provide engineering services in Brampton, including projects requiring Brampton grading plans.
We also provide engineering services in Mississauga through our Mississauga grading plan resources and Caledon through our Caledon grading plan resources.
York Region
Within York Region, we provide engineering services in Vaughan and provide information about Vaughan grading plans.
We also provide engineering services in Aurora through our Aurora grading plan resources and East Gwillimbury through our East Gwillimbury grading plan resources.
Additional service areas include Georgina with our Georgina grading plan resources, Markham with our Markham grading plan resources, and Newmarket with our Newmarket grading plan resources.
We also provide engineering services in Richmond Hill with our Richmond Hill grading plan resources, Whitchurch-Stouffville through our Whitchurch-Stouffville grading plan resources, and King through our King grading plan resources.
Our service area also includes Bradford West Gwillimbury.
Other Southern Ontario Cities and Towns
We provide engineering services in many additional Southern Ontario communities, including Hamilton, St. Catharines, Niagara-on-the-Lake, Brant, Cambridge, Kitchener, Waterloo, and Woodstock.
We also provide engineering services in Guelph, Centre Wellington, Shelburne, Orangeville, New Tecumseth, Essa, Collingwood, Wasaga Beach, and Barrie, including our Barrie grading plan resources.
Additional service areas include Midland, Orillia with our Orillia grading plan resources, Ramara, Minden Hills, North Kawartha, Kawartha Lakes, Peterborough, Selwyn, and Brighton.