A residential structural engineer in Oshawa designs the parts of a house project that carry load, such as a new beam where a load-bearing wall comes out, underpinning, an addition, a deck or a basement walkout, and prepares the structural drawings the City of Oshawa reviews with the building permit application. Elmid Design Inc. prepares the design, the permit drawings and the permit application to the City.

Renovated bungalow interior with a new engineered wood beam spanning a widened opening between the living room and kitchen, on posts, with temporary shoring beside it

Free quote for structural drawings in Oshawa: tell us about the house and the change you have in mind through our contact form, or call (647) 745-4507. We reply by email so you can send photos and any existing drawings.

This guide is for Oshawa homeowners, builders and designers who have been told a project needs an engineer. It covers the house types and projects we see in Oshawa, what the City asks for, and who does what. Our structural work is residential only: houses, their additions, decks and basements.

The image at the top of this page is illustrative (AI-generated, checked by Elmid). It shows a general example of a beam over a widened opening, not a real project, and it shows no design values.

If your project is about lot grading, servicing or stormwater rather than the house structure, our guide to civil engineering consulting in Oshawa covers that side. The two services often meet on the same project, for example a walkout that changes both the foundation and the yard grades, but they are separate designs.

What does a residential structural engineer do in Oshawa?

A residential structural engineer works out how a change to a house affects the load path from the roof to the footings, designs the new members, posts, connections and foundations, and shows them on drawings the City of Oshawa can review. The engineer prepares that part of the permit set; a contractor you hire builds the work.

In practice the work falls into a few groups:

  • Openings: removing or widening a load-bearing wall, or cutting a new door or window into an existing wall.
  • Foundations: underpinning or lowering a basement, new footings under posts, and new openings in foundation walls.
  • Additions: rear and side additions, second-storey additions, sunrooms and attached garages.
  • Outdoor structures: decks and porches that need a permit, including the footings and ledger connection.
  • Letters: engineering letters within scope, for example confirming a structural change shown on Elmid’s own drawings.

Which Oshawa homes most often need structural drawings?

Oshawa has a wide range of housing: older brick and frame houses in the established neighbourhoods around the downtown, post-war bungalows, side-splits and back-splits, and newer subdivision homes in north Oshawa such as Windfields and Kedron. Each era brings its own structural questions when owners renovate, add on or finish a basement.

Older houses near the downtown. Many were built before modern framing practice, with dimension lumber of varying sizes, interior bearing walls in unexpected places and footings whose size is not recorded. Opening up the main floor or lowering the basement in these houses usually starts with finding out what the existing structure is, so the engineer often asks the contractor to expose framing or a footing before the design is final.

Post-war bungalows and split-levels. These are common targets for open-concept renovations, basement apartments and second-storey additions. A centre bearing wall or a basement beam on steel posts usually carries the floor and roof, and moving any of it changes the load on the posts and footings below.

Newer subdivision homes. Houses in north Oshawa often have engineered floor joists and roof trusses. Owners ask about walkouts, decks over walkout basements, finished basements with a post removed, and rear additions. Engineered products have their own rules for cutting, notching and bearing, so the design has to respect the manufacturer’s information as well as the Building Code.

Does the City of Oshawa require a permit for structural work?

Yes. The City of Oshawa lists additions, alterations, finishing a basement, adding a dwelling unit and building a deck or porch among the projects that need a building permit. Removing a load-bearing wall, underpinning and cutting new foundation openings are alterations, so they need a permit before work starts.

The City’s own page also lists what does not need a permit, such as repairing a porch or deck where the repair is non-structural, replacing a same-size window or door on a house, and a deck 600 mm or less above the ground with no roof. The word that matters is structural: once the work changes what carries load, it is no longer a simple repair.

The City publishes a guide called “When do I need a building permit?” with more examples. If you are unsure, check with Building Services before you open a wall. Our overview of the building permit drawing process in Oshawa covers the wider permit set.

What does the City of Oshawa ask for with a permit application?

For most house projects the City asks for the provincial application to construct or demolish, Schedule 1 designer information, an owner’s authorization form if someone else applies, the applicable law form, and plans drawn to scale showing materials, sizes and spans, plus a survey or site plan with property lines and setbacks.

Applications go through the City’s online Application Portal, where applicants can also check status and pay fees. Before uploading, the City asks applicants to follow its digital submission standards, which set out how drawings and documents should be prepared as files.

The City notes that you may need an architect, a Professional Engineer, or a designer qualified with a Building Code Identification Number (BCIN) to draw your plans. For house projects where a member falls outside the Building Code’s Part 9 prescriptive tables, the structural part is designed by an engineer, and the rest of the house drawings may come from a BCIN designer or an architect.

Oshawa also lists the Commitment to General Review form among its permit forms. Where an engineer’s design requires it, the owner commits to having the design professional review the construction for general conformity with the design. Elmid provides that review for its own structural design where the City requires it.

Can I get the original drawings of my Oshawa house?

Often, yes. The City of Oshawa offers a search for building permit drawings, and a property owner can request the permit drawings associated with their property where they exist. Old drawings can show the original framing, beam and footing layout, which helps the engineer understand the structure before designing the change.

How is a load-bearing wall removed safely in an Oshawa house?

The engineer first confirms whether the wall carries load and what it carries, then designs a beam to replace it, the posts at each end and the footings under those posts. The drawings note temporary shoring by the contractor. The City reviews the drawings before any wall comes out.

In a bungalow, the main-floor bearing wall often sits over a basement beam, so the posts of the new beam have to land on something that can carry them all the way down. In a two-storey house, the wall may carry the floor above and part of the roof. The choice between an engineered wood beam and a steel beam depends on the span, headroom and access, and our LVL vs steel beam guide explains how that choice is made.

Our general guide to load-bearing wall removal in Ontario covers how to tell whether a wall is bearing and what the permit drawings show.

What about underpinning or lowering a basement in Oshawa?

Underpinning extends the existing foundation down in planned sections so a basement can be lowered or a new basement apartment gets usable ceiling height. It is structural work on the foundation, so it needs an engineered design, a building permit from the City of Oshawa, and a contractor experienced in the sequence.

Older Oshawa houses with low basements are the usual candidates, often as part of adding a second unit. The drawings show the underpinning sections and their order, the new floor and drainage below it, and how the work protects neighbouring foundations where houses are close together. Our guide to the basement underpinning permit in Ontario explains the drawings and roles in more detail.

A basement apartment brings in more than structure: fire separations, exits, ceiling heights, heating and ventilation. The City provides a guide to basement secondary suites and a basement renovation guide on its permit page, and the structural design has to fit with those requirements.

Do additions, second storeys and decks in Oshawa need an engineer?

Many do. A second-storey addition puts new load on walls, beams and footings that were sized for a single storey, so the existing structure has to be checked. A rear addition needs its own foundation and a tie to the house. Larger or higher decks, and decks with roofs, often fall outside prescriptive details.

The City chooses the application type by project: Addition-Residential for additions, attached garages, sunrooms and added storeys, and a separate deck, porch, ramp, balcony or walk-up type when that is the only work. Our guide to additions permit drawings in Ontario describes the full set an addition usually needs.

What does a basement walkout change in an Oshawa house?

A walkout cuts a new opening in the foundation wall and usually lowers the yard beside it. The engineer designs the lintel or beam over the opening, the support at each side, any retaining walls along the stairs, and how the foundation is protected where soil is removed. The City reviews it as an alteration.

Walkouts also change how water moves on the lot. All land in Oshawa is subject to the City’s Site Alteration By-law, and the City reminds owners that changing the land surface can affect drainage onto neighbours. Grading and drainage for a walkout are covered in our walkout basement drainage guide; where Central Lake Ontario Conservation Authority regulates the lot, its permission may also be needed.

How is this different from a civil engineering consultant in Oshawa?

Structural engineering deals with the house itself: beams, walls, foundations, additions and decks. Civil engineering deals with the land around it: grading, drainage, servicing and stormwater. An Oshawa project can need one or both, and Elmid prepares each as a separate design with its own drawings.

If your question is about a grading plan, a servicing connection or a stormwater report, start with our civil engineering consultant in Oshawa page. Regional water and sanitary connections are handled by Durham Region, which our Durham Region servicing guide explains.

Who does what on an Oshawa structural project?

The owner applies for the permit or authorizes an agent. The designer or architect prepares the house drawings. The engineer designs the structural members outside the Part 9 tables. The contractor shores, builds and installs. The City of Oshawa reviews the application and checks the work on site.

  • Owner: decides the scope, provides access and records, and signs the owner’s authorization if an agent applies.
  • Designer (BCIN) or architect: prepares the architectural drawings where they are needed.
  • Engineer: designs the structure that needs engineering and prepares that part of the drawings.
  • Contractor: builds to the approved drawings, provides temporary shoring and site safety.
  • City of Oshawa: reviews the application, issues the permit and visits the site at the required stages.

Why can an Oshawa application be held up?

The City of Oshawa says an application is premature and will not be processed if the proposal needs a rezoning, Committee of Adjustment approval, an Official Plan amendment, a site plan agreement or a subdivision agreement. Incomplete plans and slow replies to review comments also delay a permit.

Before the structural design is finished, check zoning for the addition or the second storey: height, lot coverage and setbacks decide what can be built. The City’s applicable law list also includes heritage approvals for designated properties, conservation authority permits and Ministry of Transportation permits near Highways 401 and 407.

What should you send for a structural design in Oshawa?

To prepare a proposal, Elmid usually asks for photos of the area being changed, any existing drawings or permit records, a survey for additions or walkouts, a sketch of what you want, and the property address. Notes on what sits above a wall, such as a bathroom or a roof ridge, help us scope the design.

  • photos of the wall, ceiling, basement and any visible framing or posts;
  • original or earlier permit drawings, if the City’s drawing search finds them;
  • a current survey for additions, decks and walkouts;
  • the architect’s or designer’s drawings, if they have been started;
  • any City comments on an application already submitted.

Costs depend on the site and scope; Elmid prepares a written proposal. The consultation and the quote are free. We prepare the design and drawings from these records; site work by Elmid is limited to the review the City requires.

Related articles

Frequently asked questions

Do I need an engineer to remove a load-bearing wall in Oshawa?

Usually yes. A new beam replacing a bearing wall carries floor and often roof loads to new posts and footings, and that load path is rarely covered by the Building Code’s prescriptive tables. An engineer designs the beam, posts and footings, and the drawings go to the City of Oshawa with the permit application.

Can a designer with a BCIN prepare my Oshawa permit drawings?

A BCIN designer can prepare house drawings within their qualification, and the City of Oshawa accepts drawings from architects, engineers and qualified designers. Where a structural member falls outside the Part 9 tables, an engineer designs that part, and the designer’s drawings and the engineer’s drawings go in together.

Does the City of Oshawa accept permit applications online?

Yes. The City of Oshawa takes building permit applications through its Application Portal, where you can also check status and pay fees. It asks applicants to prepare drawings and documents to its digital submission standards and to include the provincial application form, Schedule 1 and the applicable law form.

Is underpinning in Oshawa a structural project?

Yes. Underpinning extends the existing foundation down in planned sections, so it changes how the house is supported and needs an engineered design and a building permit. The drawings set the sequence of sections and protect neighbouring foundations, and a contractor experienced in underpinning carries out the work.

Can Elmid write an engineering letter for my Oshawa house?

Elmid writes engineering letters within its residential structural scope, usually connected to its own design, for example confirming a structural change shown on its drawings. We do not offer general home condition reports. Tell us what the letter is for and who asked for it, and we will confirm whether it fits our scope.

How much does a structural engineer cost in Oshawa?

Costs depend on the site and scope: what is being changed, how much of the existing structure needs checking, and what the City asks for. Elmid prepares a written proposal after reviewing photos and any existing drawings. The consultation and the quote are free, and a contractor prices the construction separately.

Sources

This article is general information for Oshawa, Ontario, not design advice for a specific property. Requirements change; confirm the current process with the City of Oshawa Building Services before you apply.


Geographic Locations That We Service:

Our Licensed Professional Engineers specializing in residential structural design and building permit drawings prepare beam and load-bearing wall designs, underpinning, addition, deck and walkout drawings and engineering letters to obtain building permits in Ontario, including a wide range of municipalities. Each area has its own building department process and requirements, so the drawings are tailored to each one.

Toronto and Surrounding Areas

In the vibrant heart of Ontario, we service Toronto (City of Toronto) and surrounding areas. Additionally, we cover Oshawa (City of Oshawa), Pickering (City of Pickering), and Clarington (Municipality of Clarington). Furthermore, our expertise extends to Ajax (Town of Ajax), Whitby (Town of Whitby), Brock (Township of Brock), Scugog (Township of Scugog), and Uxbridge (Township of Uxbridge). 

Halton Region

Moving to the Halton Region, our services encompass Burlington (City of Burlington) and Halton Hills (Town of Halton Hills). Also included are Milton (Town of Milton) and Oakville (Town of Oakville). 

Peel Region

In the Peel Region, we provide services in Brampton (City of Brampton), Mississauga (City of Mississauga), and Caledon (Town of Caledon). 

York Region

Our services in the York Region cover Vaughan (City of Vaughan), Aurora (Town of Aurora), and East Gwillimbury (Town of East Gwillimbury). We also cater to Georgina (Town of Georgina), Markham (City of Markham), Newmarket (Town of Newmarket), Richmond Hill (City of Richmond Hill), Whitchurch-Stouffville (Town of Whitchurch-Stouffville), King (Township of King), and Bradford-West Gwillimbury (Town of Bradford-West Gwillimbury). Each municipality here offers a distinct setting, requiring our specialized approach.

Other Southern Ontario Cities and Towns

We also serve many other cities and towns in Southern Ontario. These include Hamilton (City of Hamilton), St. Catharines (City of St. Catharines), Niagara on the Lake (Town of Niagara on the Lake), Brant (County of Brant), Cambridge (City of Cambridge), Kitchener (City of Kitchener), Waterloo (City of Waterloo), and Woodstock (City of Woodstock). Furthermore, we operate in Centre Wellington (Township of Centre Wellington), Shelburne (Town of Shelburne), Orangeville (Town of Orangeville), New Tecumseth (Town of New Tecumseth), Essa (Town of Essa), Collingwood (Town of Collingwood), Wasaga Beach (Town of Wasaga Beach), Barrie (City of Barrie), Midland (Town of Midland), Orillia (City of Orillia), Ramara (Town of Ramara), Minden Hills (Town of Minden Hills), North Kawartha (Town of North Kawartha), Kawartha Lakes (City of Kawartha Lakes), Peterborough (City of Peterborough), Selwyn (Town of Selwyn), and Brighton (Municipality of Brighton).

Share This Guide

Related Engineering Guides

Contact Elmid Design Inc.

Let’s discuss
your project.

Engineering design services across Toronto, the GTA and Ontario.

Contact Elmid Design Inc. for engineering and design support. Tell us about your property and proposed work so we can help identify the next steps.

Contact Us graphic with email and phone symbols over an engineering site plan.

Supporting projects in Toronto and other communities across the GTA and Ontario.

A CLEAR FIRST STEP

Contact Our Engineering Team

Share what you have now. You don’t need a complete drawing package to start.

Scroll to Top
Planning a project? Speak with our engineering team. ☎ (647) 745-4507✉ info@elmid.ca Request a Proposal →